402306_A95_RevH
Maintenance
33
REMOVING THE SHOT VALVE CONTROL CABLE (FIGURE 6)
1. Remove shot from hopper.
2.
Loosen the two adjustment nuts (1) to loosen cable from bracket.
3. Loosen set screw on linkage (2) and slide linkage from shaft.
4. Unscrew swivel (3) from cable (4).
5. Remove shot control lever from front of control box.
INSTALLING THE SHOT VALVE CONTROL CABLE (FIGURE 6-7)
1. Replace shot control lever onto front of control box.
2. With swivel (3) inserted into linkage (2), thread the swivel completely onto cable (4) so swivel bottoms out.
3.
Slide cable into bracket. Do not tighten the adjustment nuts (1) at this time.
4.
Slide linkage (2) onto shaft and tighten set screw on flat of shaft. Linkage should be flush with end of shaft.
5. Close the shot valve by moving the shot control lever to the closed position.
6.
Hand tighten the adjustment nuts (1) making sure that the shot valve flap (5) is fully closed.
7. Move shot control lever back and forth several times verifying the shot valve opens and closes.
8.
Tighten the adjustment nuts (1) so the cable is secured to the bracket.
9. Set the amperage. See
Setting the Amperage
procedure.
WARNING:
BEFORE PERFORMING MAINTENANCE, ALWAYS DISCONNECT THE MACHINE FROM POWER TO PREVENT ACCIDENTAL
STARTUP.
FIG. 7
FIG. 6
2
4
3
5
1
Shot valve flap fully closed