Installation Manual: The Bambino™ and The Transformer™
10
Revision Date 4/9/2019
The Transformer™
WARNING
Do not Modify Power Connections
2.4. Facility Requirements
2.4.1. Temperature
– The system is designed to run in a climate-controlled facility, where the
temperature is maintained between 60°F and 80°F.
2.4.2. Ventilation and Dust Control
– Apeks systems should be placed in a well-ventilated
environment that is free from excess dust from other manufacturing operations.
2.4.3. Foundation
– Apeks systems are designed to be installed on a concrete (or similarly stable) flat
floor.
2.4.4. CO
2
Vent
– Customer is responsible for running rigid tubing from system outlet to a safe vent
location. (
NOTE
: Vent lines should be rated to the pressure of the system. 3/8" x.035 or
1/2" x.049 stainless steel tubing recommended. Contact Apeks for part recommendation if
necessary.)