
AP Diving Ltd. APV200 Inflator Maintenance Manual
Page 23 of 30
6.3 Put new back end rubber and back end washer onto stem assembly
- The end of the stem is split. You can just push the new white back end rubber onto
the stem assembly, with the rounded side facing the breathing module.
- Push the back end washer over the split end of the stem.
- Check proper placement by rotating the washer to make sure it is fully over the split
end of the stem.
6.4 Push breathing module into APV200 body
- Gently push the breathing module straight into the body, making sure not to trap or
dislodge the O-ring in the process.
- Make sure the legs are in the correct position, as shown on next page.
o
Do NOT rotate the breathing module during placement.