![Anywave ATSC 1KW Quick Start Manual Download Page 7](http://html1.mh-extra.com/html/anywave/atsc-1kw/atsc-1kw_quick-start-manual_2949028007.webp)
ATSC 1KW TX Quick Start Guide
ACT-1000-QSG-DOC-V1.6, 9/12/2014
Page 7 of 23
3
TX System Overview
Final assembly and test of each transmitter is performed at the Anywave factory.
The Exciter is setup on the desired channel frequency and the TX is tested with the
complete RF system (if purchased) at full power into a load. All TX operating
parameters are optimized and the Transmitter Forward, Reflected, and Reject load
power meters are properly calibrated. Linear and Nonlinear precorrection is performed
and automatically stored in non-volatile memory inside the Exciter. A Factory Test
Report is completed for each system, providing a record of full power operating
parameters and performance. The TX then goes through a final 24-hour burn-in period
and check out before being shut done and packed up for shipment.
In your shipment, you should receive a copy of the following documentation.
- Packing Checklist
- Transmitter Factory Test Report
- 1KW TX Quick Start Guide
- 1KW TX and Exciter User Manuals
Carefully unpack and inspect all your equipment and please review the Packing
Checklist when you receive your system to be certain you have received all your system
components. Also, please be sure to identify and remove all packing materials and
supports (foam pads, etc.) inside the Transmitter prior to initial turn on of the
equipment.