5
P/N 1011263 Rev. D 04/18
INSTALLATION
Unpacking
1.
Open the large box. It contains:
• GST-5V toaster
• Accessories box
2.
Remove the accessories box from the
large box.
3.
With the help of another person,
carefully remove the GST-5V from
the large box.
4.
Remove all protective coverings
from the unit.
5.
Open the Accessories Box. It con-
tains:
• Owner’s Manual
• Bun Buffer Frame
6.
Wipe the entire exterior of the
toaster and the accessories men-
tioned above with a clean towel
sprayed with an approved sanitizer.
Allow to air dry.
NOTE:
Handle accessories with care. If
an accessory becomes bent or
damaged, it may not attach to
the unit correctly, which may af-
fect normal operation.
NOTE:
If any parts are missing or dam-
aged, contact Antunes Customer
Service IMMEDIATELY at +1-877-
392-7856 (toll free).
Location
When placing the toaster into service, pay
attention to the following guidelines:
y
Make sure power is off and the
toaster is at room temperature.
y
Do NOT block or cover any
openings on the unit.
y
Do NOT immerse cord
or plug in water.
y
Keep cord away from heated surfaces.
y
Do NOT allow cord to hang over
edge of table or counter.
1.
Place the toaster in the required
position.
2.
Attach the Bun Feeder and Bun Buf-
fer Frame accessories (Figure 1).
3.
Attach the optional Top Feeder if
present (Figure 1).
4.
Plug the power cord into an ap-
propriate power outlet. Refer to the
specification plate for
the proper voltage.
BUN FEEDER
BUN BUFFER
FRAME
REAR
CONVEYOR
COVER
Figure 1. GST-5V Components (Belts not Shown)
CONTROL
PANEL
FRONT
CONVEYOR
COVER
COMPRESSION
KNOB
OPTIONAL TOP FEEDER
(AVAILABLE FOR PURCHASE SEPARATELY)