Winch Assembly
Reassemble the winch, inverting the operations described above in
points 2 and 1. Fix the motor unit to the sub-base, tighten the 8 scews
F2 so that the Motor Unit matches perfectly to the flange (F).
4
Ensure that the drainege holes of the sub-base are facing in the right
direction.
Seal the holes for the anchoring screws and the join between the
skirt and the deck with silicone.
Seal this join with a silicone gasket (such as Motorsil Arexons).
Caution - The weight of the motor unit must be supported from below
so as to distribute its tension correctly on the screws F2, the uneven
distribution of the unit’s weight could cause it to tilt with respect to the
flange F, jeopardising perfect coupling and therefore the operation of
the electric winch.
For the same reason the motor unit must not «touch» the deck or the
structures below it.
Lubrication
During assembly all the steel screws and washers must be generously
greased to avoid corrosion phenomena in the areas in contact with
aluminium parts.
Antal supplies a special Teflon grease for marine applications:
“TLF400” in 100 gr packs.
This product is an excellent lubricant and ensures lasting protection of
the aluminium against corrosion phenomena.
5
NO
OK
S
MOTOR
UNIT
F2
XT66EH, XT70EH, XT66EV, XT70EV
Installation and Maintenance
9