Antaira Industrial Ethernet Switches
LNX-0702C-SFP Series User Manual V1.1
10
2.7 Wiring the Power Inputs
To insert the power wire, please follow the steps below.
1. Insert the positive and negative wires into the PWR1 (V1+, V1-) and PWR2 (V2+, V2-)
contacts on the terminal block connector as shown below in Figure 2.14.
2. Tighten the wire-clamp screws to prevent the wires from loosening, as shown below in Figure
2.15.
Note
Only use copper conductors, 60/75°C, tighten to 5 lbs.
The wire gauge for the terminal block should range between 18~20 AWG.
Figure 2.15
Power Terminal Block
Figure 2.14
Power Terminal Block