To remove the LC connector from the transceiver, please follow the steps shown below:
1. Press the upper side of the LC connector from the transceiver and pull it out to release as shown below
in
Figure 2.8
.
2. Push down the metal clasp and pull the transceiver out by the plastic part as shown below in
Figure 2.8
.
2.8 Wiring the Power Inputs
lease follow the below steps to insert the power wire.
1. Insert the positive and negative wires into the PWR1 (V1+, V1-) and PWR2 (V2+, V2-) contacts on the
terminal block connector as shown below in
Figure 2.10
.
2. Tighten the wire-clamp screws to prevent the wires from loosening.
Note
•
Only use copper conductors,
100
°
C, tighten to 5 lbs.
•
The wire gauge for the terminal block should range between 18~20 AWG
•
To eliminate power fault alarm, jumper Pin 1 to Pin 5 and Pin 2 to Pin 6 when using
only one power supply
Figure 2.8 - Remove LC Connector
Figure 2.9 - Pull Out from the SFP Module
Figure 2.10 - Power Terminal Block