4. Hardware Installation
4.1 Installation Steps
This section will explain how to install Antaira’s LMP-1202G-SFP series: 12-port industrial gigabit
PoE+ managed Ethernet switches with 8*10/100/1000Tx (PSE: 30W/Port), 2*10/100/1000 (Non-
PoE Ports) and 2*100/1000 dual rate SFP fiber slots.
Caution: This device is intended for use indoor and at altitudes up to 2000 meters.
Caution: The device is intended to be installed in an industrial control enclosure and panel.
Installation Steps
1. Unpack the industrial Ethernet switch from the original packing box.
2. Check if the DIN-Rail bracket is screwed on the industrial Ethernet switch.
If the DIN-Rail is not screwed on the industrial Ethernet switch, please refer to the
DIN-Rail Mounting section for DIN-Rail installation.
If you want to wall mount the industrial Ethernet switch, please refer to the Wall
Mounting section for wall mounting installation.
3. To hang the industrial Ethernet switch on a DIN-Rail or wall, please refer to the Mounting
Installation section.
4. Power on the industrial Ethernet switch and then the power LED light will turn on.
If you need help on how to wire power, please refer to the Wiring the Power Inputs
section.
Please refer to the LED Indicators section for LED light indication.
5. Prepare the twisted-pair, straight-through category 5 cable for Ethernet connection.
6. Insert one side of the RJ-45 cable into switch’s Ethernet port and on the other side into the
networking device’s Ethernet port, e.g. switch PC or server. The Ethernet port’s (RJ-45) LED
on the industrial Ethernet switch will turn on when the cable is connected to the networking
device.
Please refer to the LED Indicators section for LED light indication.
7. When all connections are set and the LED lights all show normal, the installation is complete.
4.2 Maintenance and Service
If the device requires servicing of any kind, the user is required to disconnect and remove it from
its mounting. The initial installation should be done in a way that makes this as convenient as
possible.
Voltage/Power lines should be properly insulated as well as other cables. Be careful when
handling them so as to not trip over.