
13
Deutsch
|
English
| Français | Español | Português | Svenska
Italiano | Nederlands | Dansk | Suomi | Norsk
Deutsch
|
English
| Français | Español | Português | Svenska
Italiano | Nederlands | Dansk | Suomi | Norsk
6.
Top-off charge: Ensures that the battery is gently
charged to 100% capacity
7.
Trickle charge: Battery is kept in a fully charged state by
means of charging pulses
For 9V E-Block:
Capacity quick test, Charging, Time-controlled cut-off, trickle
charging
OPERATION
NORMAL CHARGING PROCESS
CHARGING PROCESS WITH
PRE-DISCHARGE *1
Connect the charger to an electrical outlet.
Insert the battery into the charging slot with the correct
polarity (see engraving in the charging slot).
The product displays the charge status of the battery for
5 seconds and then automatically starts the charging
process.
Press the Discharge button.
Pre-discharge starts for all
inserted round cells
After all round cells have
been discharged, the
charging process starts
automatically.
As soon as a battery is fully charged, the charger switches
to trickle charge.
You can now remove the fully charged battery.
After all batteries have been removed, disconnect the
product from the power supply.
*1 Discharge function only for round cells
NOTE: It is not necessary to discharge batteries before each
charge. We recommend pre-discharging after approx. 10
charging processes to prevent the lazy-battery effect, which
reduces the discharge voltage of batteries. This effect occurs
if NiMH batteries are often only partially discharged and then
recharged.