![Anritsu MN4765B Operation Manual Download Page 9](http://html1.mh-extra.com/html/anritsu/mn4765b/mn4765b_operation-manual_2945195009.webp)
O/E Module MN4765B OM
PN: 10410-00742 Rev. H
2-1
Chapter 2 — Installation
2-1
Introduction
This chapter provides installation instructions for the MN4765B O/E
Calibration Module. It includes information on initial inspection, preparation
for use, storage, and reshipment.
2-2
Unpacking and Initial Inspection
The MN4765B ships in two protective boxes, one external and one internal.
Inspect the shipping container for damage. If the shipping container or
cushioning material is damaged, retain until the contents of the shipment
have been checked against the packing list and the module has been checked
for mechanical and electrical operation. If the shipment is incomplete or if the
test set is damaged mechanically or electrically, notify your local sales
representative or Anritsu Customer Service. If either the shipping container
is damaged or the cushioning material shows signs of stress, notify the
carrier as well as Anritsu. Keep the shipping materials for the carrier's
inspection.
2-3
Contents
The MN4765B and all the necessary equipment to safely and correctly handle
the calibration module. The items included are:
•
MN4765B with user specified options
•
AC adapter and power cord
•
Calibration certificate
•
USB memory device (containing a copy of the MN4765B calibration
data)
Summary of Contents for MN4765B
Page 2: ......
Page 14: ...2 6 PN 10410 00742 Rev H O E Module MN4765B OM 2 4 Preparation for Use Installation...
Page 30: ......