![ANGI ENERGY SYSTEMS CNG Operation And Maintenance Manual Download Page 13](http://html1.mh-extra.com/html/angi-energy-systems/cng/cng_operation-and-maintenance-manual_2943645013.webp)
9
ANGI OPERATION AND SERVICE MANUAL
Rev
2006/06
4) Insure there is no source of ignition near or
down wind of the compressor station.
5) Open the manual ball valve, located near the
final compressor stage relief valve, in the final
stage discharge line to vent discharge line
gas.
6) Open the manual ball valve on the captive
receiver tank to vent the gas in the tank.
Failure to heed any of the above warnings or
misuse of the compressor, even though not
expressly mentioned herein, may result in
severe injury or death, property damage and/or
mechanical failure for which ANGI will not be
held responsible.
3.4 LIFTING/TIE DOWN
The compressor station will be provided with four
lifting eyes on the outside corners of the station or
it will be supplied with four overhead lifting eyes. If
overhead lifting eyes are provided, use them
instead of the 4 corner lift points to eliminate the
requirement for the long spreader bar and to
reduce the occurrence of damage to the
compressor enclosure.
If there are any question regarding lifting, tie
down or securing this equipment, contact
ANGI prior moving this equipment.
Only designated personnel shall do the lifting.
The load capacity rating shall be clearly
marked on hoist. Do not exceed load rating.
Inspection and testing for cracks or defects in
hoist system shall be performed on a regular
basis. Before lifting, alert personnel in
immediate areas. Do not stand under unit while
it is being moved from one area to another on
a hoist. Do not stand under unit to do
maintenance work.
Lifting eyes are positioned to provide safe
lifting and/or tie down and must be used
properly. Secure or lift using all rings at all
times. Secure at approved tie down points
only. Failure to follow proper procedures can
result in damage to equipment and injury to
personnel.