C
T
39
60
36
00
_1
.f
m
-
II
-
(1) -Test point pressure
(2) - Nominal gas consumption
(2.1) - Main burner injector size
(3) - Turndown gas consumption
(3.1) - Bypass injector size
(3.2)- Bypass test point pressure
(4) - Pilot injector size
(5) - Iron Ring holes
N.G.C. (2)
T.G.C. (3)
Pilot flame Iron Ring
GAS TPP (1) Supply pressure
G.C.
Ø (2.1)
G.C.
Ø (3.1)
p (3.2)
Ø (4)
Ø (5)
NGN
0.8 kPa
1.13 kPa
80
MJ/h
3.20
mm
40
MJ/h 1.
3
0 mm
adj-pressure
0.1
3
kPa
0.40 mm
6 holes x
5.5 mm
ULPG
2.75 kPa
2.75 kPa
80
MJ/h 1.
70
mm
40
MJ/h 1.
3
0 mm
NO adj
All screw
0.25 mm
6 holes x
5.5 mm