Anest Iwata ISP-50 Instruction Manual Download Page 9

 

-7- 

Contents 

Important infomation ..................................................................................................................1 

Important information .............................................................................................................1 

For safe operation ...................................................................................................................2 

Contents.......................................................................................................................................7 

1. Before use................................................................................................................................8 

1.1 Check the product.............................................................................................................8 

2. Name and structure of each section...................................................................................11 

3. Installation .............................................................................................................................12 

3.1 Wiring................................................................................................................................13 

3.2 Test operation..................................................................................................................17 

3.3 Connection to vacuum system (chamber) ...................................................................18 

4. Operation ...............................................................................................................................19 

4.1 Standard operation .........................................................................................................21 

4.1.1 Start-up ......................................................................................................................21 

4.1.2 Shut-down .................................................................................................................21 

4.2 Air-flush operation ..........................................................................................................22 

4.2.1 Preparation ................................................................................................................22 

4.2.2 Start-up and shut-down ...........................................................................................23 

4.2.3 When returning to standard operation...................................................................23 

5. Maintenance and inspection................................................................................................24 

5.1 Daily maintenance and inspection ................................................................................24 

5.2 Maintenance.....................................................................................................................25 

6. Problems and remedies .......................................................................................................26 

7. Disposal .................................................................................................................................27 

8. Specifications ........................................................................................................................28 

8.1 Specifications ..................................................................................................................28 

8.1.1 ISP-50.............................................................................................................................28 

8.2 Dimensions ......................................................................................................................29 

8.2.1 ISP-50-SV1.....................................................................................................................29 

8.3 Performance data ............................................................................................................30 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for ISP-50

Page 1: ...urchase date When you began operation This instruction manual includes very important warnings cautions and operating procedure in order to operate this pump safely and efficiently Be sure to read thi...

Page 2: ......

Page 3: ...d marks have the following meanings Examples of marks WARNING Indicates a potentially hazardous situation which if not avoided may result in serious injury or loss of life CAUTION Indicates a potentia...

Page 4: ...jury due to turning objects Install overcurrent protective device Danger of accident fire and failure Be sure to install protective device to protect circuitry We recommend an overcurrent protective d...

Page 5: ...n cause bodily injury from entanglement with turning section or foreign matter dispersal Never alter Danger of electric shock and entanglement Do not remove or alter safeguards or insulation parts If...

Page 6: ...Danger of problem recurrence and failure If protective device or thermal protector activates be sure to turn off electric source and inspect causes to solve the problem Do not operate until problem i...

Page 7: ...nger of remaining moisture When evacuating moisture be sure to open air flush port air flush operation If you evacuate vapor while air flush port is closed condensed moisture will remain inside vacuum...

Page 8: ...s keep warning stickers clean and legible If they become dirty or detached replace them with new ones If you need replacement stickers contact the dealer who sold the vacuum pump to you Motor frame Re...

Page 9: ...er 18 4 Operation 19 4 1 Standard operation 21 4 1 1 Start up 21 4 1 2 Shut down 21 4 2 Air flush operation 22 4 2 1 Preparation 22 4 2 2 Start up and shut down 23 4 2 3 When returning to standard ope...

Page 10: ...side up before opening Check that the model of the product is the same as the one you ordered How to read model name I S P 5 0 S V 1 ISP model Inlet direction V vertical Motor S Single phase Displace...

Page 11: ...itten by official languages except English must be sent to a customer along with the delivery of a product Air muffler for air flush ISP 50 is attached to outlet flange Please prepare electric wires c...

Page 12: ...m pump If not it can cause damage failure or bodily injury from falling vacuum pump or by being caught between vacuum pump and other material Be careful about lifting This product does not come with a...

Page 13: ...11 2 Name and structure of each section ISP 50 Motor power box Inlet NW25 Turning direction plate Motor Outlet NW16 Air Flush Port Rc 1 8 Cooling fan Receptacle Hour meter...

Page 14: ...f 5 40 Operating at a temperature range other than that designated can cause accident failure or bodily injury such as burns due to overheating Use at designated temperature Danger of overheating Inst...

Page 15: ...ectrician to perform electric wiring If not short circuit or electric shock can cause fire or bodily injury Ask qualified electrician Danger of electric shock and entanglement Be sure to turn off elec...

Page 16: ...n cause short circuit fire or bodily injury from electric shock due to looseness or disconnection Be careful about insertion Danger of electric shock Connect grounding wire to electric source If not i...

Page 17: ...ge Danger of problem recurrence and failure If motor protective device or thermal protector activates be sure to turn off electric source and inspect causes to solve the problem Do not operate until p...

Page 18: ...epare electric wire with a connector corresponding to the receptacle table 2 Protective device must be installed between this cord and electric source Insert a connector of electric wire into receptac...

Page 19: ...ure Prevent foreign matter from entering Danger of overheating Check that cooling fan is turning and cooling air is flowing If not it can cause accident failure or bodily injury such as burns due to o...

Page 20: ...recommend the use of an automatic valve as the isolation valve which closes during power failure in order to prevent the drawback of debris inside pump into the vacuum chamber during power failure Use...

Page 21: ...inger or foreign matter into air hole of fan cover air hole of motor or clearance between FS 1 and FS 2 cooling fins If done it can cause bodily injury from entanglement with turning section or foreig...

Page 22: ...ndensed water will remain inside vacuum pump and cause failure Operate while opening air flush port Danger of insufficient vapor exhaust After evacuating vapor do air flush operation for at least one...

Page 23: ...cause failure When doing air flush operation Noise level and ultimate pressure will increase by 7 8dB about 5Pa Install pump in an area which is not exposed to debris such as iron powder stone powder...

Page 24: ...ng vapor You must shorten maintenance interval 5 2 page 25 when evacuating vapor since vapor temperature disposal volume disposal frequency and substances in vapor have an influence on pump operation...

Page 25: ...sure to close isolation valve between vacuum pump and vacuum chamber during pump shut down If vacuum pump stops during air flush operation atmospheric air is drawn back from air flush port to inside...

Page 26: ...uct maintenance and inspection after you turn off electric source If not it can cause bodily injury from electric shock or turning object Turn off electric source Danger of accident failure and shorte...

Page 27: ...very8 000 hours Every2 yearor every16 000hours Every400times of vapor pumping Bearing kit grease Tip seal set Seal set O ring set Exhaust valve set Air flush kit Pin crank kit Vacuum pump itself Insid...

Page 28: ...t and repair Improper exhaust piping Check exhaust piping diameter and length Air outlet is clogged Remove blank flange from exhaust outlet Motor stops soon Motor protection gear activates Air outlet...

Page 29: ...27 7 Disposal When a vacuum pump is disposed please comply with local law such as the Waste Disposal Law...

Page 30: ...et connection NW16 Direction of inlet Vertical Dimensions mm L W H 317 155 227 Mass kg 12 Cooling system Air cooled O t h e r s With hour counter and air flush Note 1 Pumping speed and ultimate pressu...

Page 31: ...29 8 2 Dimensions 8 2 1 ISP 50 SV1...

Page 32: ...30 8 3 Performance data...

Page 33: ...memo...

Page 34: ...rer 3176 Shinyoshida cho Kohoku Ku Yokohama 223 8501 Japan Tel 81 0 45 591 1112 Fax 81 0 45 591 1539 http www anest iwata co jp European agent Corso Vigevano 56 10155 Torino ITALY Tel 39 1 1248 0868 F...

Reviews: