![Andrew 9.3-Meter ESA Installating And Operation Manual Download Page 47](http://html1.mh-extra.com/html/andrew/9-3-meter-esa/9-3-meter-esa_installating-and-operation-manual_2942525047.webp)
Reflector/Back-
structure to
Ground Mount
Assembly
Installation
Step 1
Step 2
47
Installation Procedures
Refer to Figure 45. Attach 5/8 in (16 mm) shackles with corresponding 20 ft (6 m) chok-
ers to four drum assembly angle brackets as shown. Attach 15 ft (4.5 m) tag line to for-
ward left of jack tripod assembly.
Note:
Two front chokers should be approximately 4 in (102 mm) longer than rear chok-
ers.
Extend azimuth jack until panning assembly is facing forward position (AZ = 0°).
Figure 45