Anderson Group
Double Stretcher – Operator’s Manual
15
3
Settings and Start-up
This chapter des cribes the st ages o f prepara tion an d t he start u p o f th e do uble s tretcher
system of the 800HS wrapper.
Warning!
Please make sure to also follow the setup stages
described in the wrapper operator manual.
3.1
Before you start
Before operating your do uble stretcher, be sure that it is well greased and the rollers and the
folding arm are clean and have no defects (scratches).
3.2
Moving the wrapper
If needed, move your wrapper to the place you will be storing your bales.
Warning!
Before you m ove the wrapper for any re ason be
sure t hat th e double stretcher is locked in it s
transport po sition. ( section
Error! Refer ence sou rce
not found.
on page 31).
3.3
Positioning of the double stretcher for wrapping
Before beginning the wrapping of bales, place the double stretcher in the wrapping position by
proceeding as follows:
1.
Remove the pin that holds the double stretcher arm in transport position.
2.
Unlock the arm of the doubl e stretcher and put it in the wrapping po sition. The
angle of the arm should be less than 90° to the front of the wrapper.
3.
Insert the pin into one of the holes for adjustment of the arm to hold it in place while
wrapping.
NOTE :
The fix ing p oint on the arm of t he d ouble stre tcher
contains several holes which allow you to adjust for bales
of different dimensions. When y ou have adjusted the arm
to work for the type of bale you are wrapping, note which
hole you are using.