4
1. Quick Start Guide
Thank you for purchasing an A&D BA-TE series analytical balance. This quick start guide describes how
to install the BA-TE series balance, and it covers the basic functions and main operations of the balance.
For further information about the BA-TE series balance, please refer to the separate instruction manuals
listed in "1.1. Detailed Manuals".
1.1. Detailed Manuals
Detailed manuals are available for download from the A&D website (https://www.aandd.jp):
BA-TE Series Instruction Manual
This is the manual to help you understand the functions and operations of the BA-TE series in detail and
make full use of them.
Ionizer (static eliminator) Instruction Manual
This is the manual describing the functions of the AX-ION-25 ionizer and instructions on use.
2. Assembly and Installation
Caution
A BA-TE series analytical balance is a precision instrument, and it should be carefully unpacked.
It is advisable to store the packing materials so that they can be used when transporting the balance.
The contents of the package vary depending on the product. Refer to the illustration of the packing
contents and make sure that everything is included.
Do not connect the AC adapter to the balance until the balance is assembled and installed.
When the balance is ready, connect the AC adapter. An operation check will be performed
automatically.
Use the dedicated AC adapter specified for the balance.
Do not connect the included AC adapter to other devices.
If you use the wrong AC adapter, the balance and other equipment may not work properly.
Make sure that the AC adapter is unplugged before you connect the ionizer.
The BA-TE series analytical balance is composed of the weighing unit and display unit. It is not
possible to replace just one of the units.
Summary of Contents for BA-125DTE
Page 1: ...BA 6TE BA 6DTE BA 225TE BA 225DTE BA 125DTE 1WMPD4004296 ...
Page 20: ...MEMO ...
Page 21: ...MEMO ...
Page 22: ...MEMO ...
Page 23: ......