background image

1.  Quick Start Guide 

Thank you for purchasing an A&D BA-TE series analytical balance. This quick start guide describes how 
to install the BA-TE series balance, and it covers the basic functions and main operations of the balance. 
For further information about the BA-TE series balance, please refer to the separate instruction manuals 
listed in "1.1. Detailed Manuals". 
 
 

1.1.  Detailed Manuals 

Detailed manuals are available for download from the A&D website (https://www.aandd.jp): 
 

BA-TE Series Instruction Manual 

This is the manual to help you understand the functions and operations of the BA-TE series in detail and 
make full use of them. 
 

Ionizer (static eliminator) Instruction Manual 

This is the manual describing the functions of the AX-ION-25 ionizer and instructions on use. 
 
 
 

2.  Assembly and Installation 

Caution 

  A BA-TE series analytical balance is a precision instrument, and it should be carefully unpacked. 

It is advisable to store the packing materials so that they can be used when transporting the balance. 

  The contents of the package vary depending on the product. Refer to the illustration of the packing 

contents and make sure that everything is included. 

  Do not connect the AC adapter to the balance until the balance is assembled and installed. 

  When  the  balance  is  ready,  connect  the  AC  adapter.  An  operation  check  will  be  performed 

automatically. 

  Use the dedicated AC adapter specified for the balance. 

  Do not connect the included AC adapter to other devices. 

  If you use the wrong AC adapter, the balance and other equipment may not work properly. 

  Make sure that the AC adapter is unplugged before you connect the ionizer. 

  The  BA-TE  series  analytical  balance  is  composed  of  the  weighing  unit  and  display  unit.  It  is  not 

possible to replace just one of the units. 

 
 

Summary of Contents for BA-125DTE

Page 1: ...BA 6TE BA 6DTE BA 225TE BA 225DTE BA 125DTE 1WMPD4004296 ...

Page 2: ...lated into any language in any form by any means without the written permission of A D Company Ltd The contents of this manual and the specifications of the instrument covered by this manual are subject to change for improvement without notice Windows Word and Excel are registered trademarks of the Microsoft Corporation ...

Page 3: ...en Buttons and Key Panel Basic Operation 10 5 IR sensors and Automatic Doors 12 5 1 IR sensors 12 5 2 Automatic doors 12 6 Check Function 13 7 Sensitivity Adjustment Calibration Test 14 7 1 Automatic sensitivity adjustment 14 7 2 Sensitivity adjustment using the internal mass 14 8 Typical Errors Error Codes 15 9 Ionizer AX ION 25 17 9 1 Using the Ionizer 17 10 Specifications 18 11 Compliance 19 11...

Page 4: ...ly and Installation Caution A BA TE series analytical balance is a precision instrument and it should be carefully unpacked It is advisable to store the packing materials so that they can be used when transporting the balance The contents of the package vary depending on the product Refer to the illustration of the packing contents and make sure that everything is included Do not connect the AC ad...

Page 5: ...pane Base stand Aluminum round pans for analysis 10 pieces each Large pan Φ15 0 8 mL Medium pan Φ12 0 3 mL Breeze break doors Small pan Φ8 0 05 mL Pan A Φ25 Breeze break ring A Dust plate B Breeze break front glass Breeze break doors Breeze break unit Weighing unit Display unit protection cover Breeze break top door Breeze break bottom plate Display unit Tweezers Cable A Cable B Cable C USB cable ...

Page 6: ...emble the five parts of the weighing pan in the correct position by referring to the cross sectional view For BA 225TE BA 225DTE BA 125DTE assemble the four parts of the weighing pan in the correct position by referring to the cross sectional view Breeze break unit Step 1 Step 3 Step 2 Weighing unit For BA 225TE BA 225DTE BA 125DTE For BA 6TE BA 6DTE Pan A Pan support A Breeze break ring A Dust pl...

Page 7: ...the left and right sides 7a Insert the breeze break doors on the left and right sides 7b Secure the breeze break doors with the latches Step 8 Assemble the breeze break front glass 8a Insert the breeze break front glass 8b Secure the breeze break front glass with the latches Notch Example of the small breeze break with the right side open Base stand Step 5 Top pane Side panes 3 pieces Base stand S...

Page 8: ...irection of the arrow on each cable Step 10 Connect the breeze break unit and ionizer with the included cable C Caution The ionizer operates when the AC adapter is connected to the balance Step 11 Connect the included AC adapter to the balance BA 225TE BA 225DTE BA 125DTE BA 6TE BA 6DTE Breeze break unit Display unit Weighing unit Ionizer Step 9 Step 11 AC adapter Step 10 ...

Page 9: ... for at least an hour or at least four hours for BA 6TE BA 6DTE with the AC adapter connected to the power supply Perform sensitivity adjustment of the balance before using it for the first time or after having moved it to another location so that accurate weighing can be performed For details refer to the detailed instruction manual listed in 1 1 Detailed Manuals Caution Do not install the balanc...

Page 10: ... P TEST button 2 Application button 10 Communication device setting button 3 Left IR sensor function change button 11 Right IR sensor function change button 12 Right IR sensor 4 Left IR sensor 5 Stabilization indicator 6 ON OFF key 14 LOG IN key 7 HOME key 15 MENU key 8 PRINT button 16 RE ZERO button 13 Alert ...

Page 11: ...refer to the separate instruction manual listed in 1 1 Detailed Manuals 9 CAL button Displays the sensitivity adjustment calibration screen For details refer to the separate instruction manual listed in 1 1 Detailed Manuals 10 Communication device setting button Displays the communication device setting screen Configures the settings of the connected communication device 11 Right IR sensor functio...

Page 12: ...the breeze break doors are assigned to and for the doors to be fully open or partially open in the function table of the balance For details refer to the separate instruction manual listed in 1 1 Detailed Manuals Opening the breeze break door Step 1 If you want to open the breeze break door on the left side or on the right side when it is closed hold your hand over the right IR sensor or the left ...

Page 13: ... Additionionally whether or not the balance s performance is being exhibited can be easily checked by checking the repeatability with the internal mass The check function can be selected from the menu screen For details refer to the separate instruction manual listed in 1 1 Detailed Manuals ...

Page 14: ...tions are displayed on the screen for how to adjust the sensitivity 2 Internal sensitivity adjustment The internal mass is used to automatically adjust the balance 3 Internal calibration test The internal mass is used to check the accuracy of weighing and the result is output Note that the balance is not adjusted 4 External calibration test Your external calibration weight is used to check the acc...

Page 15: ... Error 8 Abnormality in the internal memory data of the balance If this error continues to be displayed repair is necessary Please contact your local dealer for repair Error 9 Abnormality in the internal memory data of the balance If this error continues to be displayed repair is necessary Please contact your local dealer for repair Con Err Weighing unit error Data from the weighing unit has not b...

Page 16: ...or appears in repeatability display MW Error appears in minimum weighing value reference value EC E00 Communications error A protocol error occurred in communications Check the format baud rate and parity EC E01 Undefined command error An undefined command was found Check the transmitted command EC E02 Not ready The received command cannot be executed e g Q command was received when not in weighin...

Page 17: ... it in and then turn on the power The power lamp of the ionizer lights up Step 3 Place the target object within the effective range of static elimination Step 4 Hold your hand over the IR sensor touchless infrared proximity sensor on the front of the ionizer to start static elimination The ION lamp indicating that static elimination is in progress lights up Step 5 Refer to the figure below for the...

Page 18: ...TE BA 125DTE Weighing capacity 220 g 220 g 120 g 51 g 51 g Maximum display 220 00084 g 220 0008 g 120 0008 g 51 00009 g 51 00009 g Readability 0 01 mg 0 1 mg 0 1 mg 0 01 mg 0 01 mg Repeatability Standard deviation 0 015 mg 0 03 mg 50 g 200 g 0 1 mg 200 g 0 1 mg 100 g 0 025 mg 50 g 0 030 mg 50 g Linearity 0 15 mg 0 20 mg 0 20 mg Display 5 inch WVGA TFT LCD color display Operation Touchscreen and ke...

Page 19: ...s These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications Operation of this equipment in a residential area is li...

Page 20: ...MEMO ...

Page 21: ...MEMO ...

Page 22: ...MEMO ...

Page 23: ......

Page 24: ...treet Thebarton South Australia 5031 AUSTRALIA Telephone 61 8 8301 8100 Fax 61 8 8352 7409 A D KOREA Limited 한국에이 엔 디 주 서울특별시 영등포구 국제금융로6길33 여의도동 맨하탄빌딩 817 우편 번호 07331 817 Manhattan Bldg 33 Gukjegeumyung ro 6 gil Yeongdeungpo gu Seoul 07331 Korea 전화 82 2 780 4101 팩스 82 2 782 4264 OOO A D RUS OOO ЭЙ энд ДИ РУС 121357 Российская Федерация г Москва ул Верейская дом 17 Business Center Vereyskaya Plaza...

Reviews: