11
LCD will show as following, then into running. If the battery voltage is low, the controller
will turn self off.
If there is no sun to charge battery for some time, the battery voltage will reach low point,
then controller will protectively shut down self , and automatically wake up after the battery
is been recharged again.
5.2 How to register to GG-002wifi/3g system main controller
FMPVPP registration including 1. Flow meter, 2. Pressure meter, 3. Master valve, and
4.Pump.Needs registration to get system ID and code, to establish bidirectional wireless
communication between these devices and main controller.
Please read related charter of how to register.
5.3 How to establish wireless communication mesh network
After power been turn on, if all devises are already been registered, the controller will
automatically try to establish wireless communication route to reach main controller. During
searching time, keys been locked, push “Exit” to exit if needs, otherwise LCD shows
“Searching Comm path”. After route is been established, there will be two beeps, the
controller is ready for work.
If failed to establish the route, the controller will unlock the keys and back to previous menu
after 1 minute. Push digital key 4 you will see “X”, which means no route been established.
Please check and see if the distance is right, or if all the relay on the way is normal. If push
Summary of Contents for FMP-Solar
Page 6: ...5 How to install pump...