Troubleshooting

33

NXA-ENET24 Hardware Installation Guide

Troubleshooting

Diagnosing Switch Indicators 

Power and Cooling Problems

If the power indicator does not turn on when the power cord is plugged in, you may have a problem with the 
power outlet, power cord, or internal power supply. However, if the unit powers off after running for a while, 
check for loose power connections, power losses or surges at the power outlet, and verify that the fans on the 
unit are unobstructed and running prior to shutdown. 

If you still cannot isolate the problem, the internal power supply may be defective.

Installation

Verify that all system components have been properly installed. If one or more components appear to be 
malfunctioning (such as the power cord or network cabling), test them in an alternate environment where you 
are sure that all the other components are functioning properly.

In-Band Access

You can access the management agent in the switch from anywhere within the attached network using Telnet, 
a web browser, or other network management software tools. However, you must first configure the switch 
with a valid IP address, subnet mask, and default gateway. If you have trouble establishing a link to the 
management agent, check to see if you have a valid network connection. Then verify that you entered the 
correct IP address. 

Also, be sure the port through which you are connecting to the switch has not been disabled. If it has not been 
disabled, then check the network cabling that runs between your remote location and the switch. 

 

Troubleshooting Chart

Symptom

Action

PWR LED is Off

• Internal power supply may be disconnected. Check connections between the 

switch, the power cord and the wall outlet.

Diag LED is Amber

• The system has detected a fault. Power cycle the switch to try and clear the 

condition.

• If the condition does not clear, contact your dealer for assistance.

Diag LED is Flashing 
Amber

• Check that all stacking cables are properly connected.

Stack LED is Flashing 
Green or Amber

• The stack has not completed its initial configuration. Wait a few minutes for 

the process to complete.

• If flashing continues, check that the Master Select button is pressed in on 

only one switch.

• Check that all stacking cables are properly connected.

Link/Act LED is Off

• Verify that the switch and attached device are powered on.
• Be sure the cable is plugged into both the switch and corresponding device.
• If the switch is installed in a rack, check the connections to the punch-down 

block and patch panel.

• Verify that the proper cable type is used and its length does not exceed 

specified limits.

• Check the adapter on the attached device and cable connections for possible 

defects. Replace the defective adapter or cable if necessary. 

The management agent accepts up to four simultaneous Telnet sessions. If the 
maximum number of sessions already exists, an additional Telnet connection will not 
be able to log into the system.

Summary of Contents for NXA-ENET24

Page 1: ...Hardware Installation Guide Network Communication NXA ENET24 Managed Ethernet Switches Last Revised 3 05 2010...

Page 2: ...ked on the outside of each box The RMA is valid for a 30 day period After the 30 day period the RMA will be cancelled Any shipments received not consistent with the RMA or after the RMA is cancelled w...

Page 3: ...fully before installing the switch 3 France and Peru only 3 Veuillez lire fond l information de la s curit suivante avant d installer le Switch 4 France et P rou uniquement 4 Bitte unbedingt vor dem E...

Page 4: ...Source 23 Connecting to the Console Port 23 Wiring Map for Serial Cable 24 Twisted Pair Cable and Pin Assignments 24 10 100BASE TX Pin Assignments 24 Straight Through Wiring 25 Crossover Wiring 25 100...

Page 5: ...re Installation Guide 10 Mbps Ethernet Collision Domain 31 Cable Labeling and Connection Records 31 Troubleshooting 33 Diagnosing Switch Indicators 33 Power and Cooling Problems 33 Installation 33 In...

Page 6: ...iv NXA ENET24 Hardware Installation Guide Table of Contents...

Page 7: ...wisted pair UTP for RJ 45 connections Category 3 or greater for 10 Mbps connections and Category 5 for 100 Mbps connections and Category 5 or 5e for 1000 Mbps connections For fiber optic connections y...

Page 8: ...ing to EN 55024 1998 Electrostatic Discharge according to EN 61000 4 2 1995 Contact Discharge 4 kV Air Discharge 8 kV Radio frequency electromagnetic field according to EN 61000 4 3 1996 80 1000 MHz w...

Page 9: ...according to IEC 60950 The conditions are only maintained if the equipment to which it is connected also operates under SELV conditions France and Peru only This unit cannot be powered from IT suppli...

Page 10: ...mes conditions France et P rou uniquement Ce groupe ne peut pas tre aliment par un dispositif imp dance la terre Si vos alimentations sont du type imp dance la terre ce groupe doit tre aliment par une...

Page 11: ...den Cordon lectrique Il doit tre agr dans le pays d utilisation Etats Unis et Canada Le cordon doit avoir re u l homologation des UL et un certificat de la CSA Les spe cifications minimales pour un ca...

Page 12: ...Compliances 6 NXA ENET24 Hardware Installation Guide...

Page 13: ...ic events occur The NXA ENET24 also provides a full range of features for Layer 2 switching It includes a management agent that allows for feature configuration The default configuration can be used f...

Page 14: ...ut requiring its own separate power source This capability gives installers greater flexibility in deployment locations for devices such as IP cameras and wireless access points which translates into...

Page 15: ...100 to 240 V AC 47 to 63 Hz Power Consumption 48 Watts Switching system 370 Watts Power over Ethernet Maximum Current 3 8 A 110 V AC 1 7 A 240 V AC LEDs System PWR Diag Stacking Ports Link Act PoE Wei...

Page 16: ...the Compliances section on page 1 for additional information Emissions Industry Canada Class A EN55022 CISPR 22 Class A EN 61000 3 2 3 FCC Class A VCCI Class A C Tick AS NZS 3548 1995 Class A Immunity...

Page 17: ...or Gigabit Ethernet the maximum is one This is known as the hop count However a switch turns the hop count back to zero So subdividing the network into smaller and more manageable segments and linking...

Page 18: ...e Using a 1000BASE SX multimode fiber MMF SFP transceiver you can run a link up to 550 m A 1000BASE LX single mode fiber SMF link can run up to 5 km A 1000BASE LH single mode fiber SMF link can run up...

Page 19: ...to which it belongs Untagged VLANs can be used for small networks attached to a single switch However tagged VLANs should be used for larger networks and all the VLANs assigned to the inter switch li...

Page 20: ...unless it is actually required to solve a problem Otherwise back pressure jamming signals may degrade overall performance for the segment attached to the hub 3 As a general rule the length of fiber o...

Page 21: ...ovide adequate space approximately two inches on all sides for proper air flow Be accessible for installing cabling and maintaining the devices Allow the status LEDs to be clearly visible Make sure th...

Page 22: ...usting Existing Category 5 Cabling to Run 1000BASE T section on page 26 Protection from radio frequency interference emissions Electrical surge suppression Separation of electrical wires switch relate...

Page 23: ...adhesive feet to the bottom of the switch FIG 9 2 Set the device on a flat surface near an AC power source making sure there are at least two inches of space on all sides for proper air flow 3 If inst...

Page 24: ...ated 1000BASE T SFP Ports These are combination Gigabit RJ 45 ports with alternate Small Form Factor Pluggable SFP transceiver slots If an SFP transceiver purchased separately is installed in a slot a...

Page 25: ...rt has been disabled by the administrator Off No powered device is connected to the port System Status LEDs LED Condition Status PWR On Green Unit s internal power supply is operating normally Off Uni...

Page 26: ...wer Supply Receptacle The standard power receptacle is for the AC power cord It is located on the rear panel of the switch Installing a Third Party SFP Transceiver To install an SFP transceiver perfor...

Page 27: ...ack are powered on Slide the SFP transceiver into the SFP transceiver slot until it clicks into place To remove pull on the tab at the bottom of the front of the transceiver Connecting Switches in a S...

Page 28: ...and bottom switches forming a ring or closed loop The closed loop cables provides a redundant path for the stack link so if one link fails stack communications can be maintained FIG 17 illustrates a...

Page 29: ...ounded 3 pin socket AC power source 3 Check the front panel LEDs as the device is powered on to be sure the PWR LED is lit If not check that the power cable is correctly plugged in Connecting to the C...

Page 30: ...Also be sure that the length of any twisted pair connection does not exceed 100 meters 328 feet Data is delivered on the standard two wire pairs pins 1 2 3 and 6 and PoE power is supplied using the t...

Page 31: ...d in the wiring When auto negotiation is enabled for any RJ 45 port on this switch you can use either straight through or crossover cable to connect to any device type 10 100BASE TX MDI X and MDI Port...

Page 32: ...ct the problem 1 Replace any Category 5 patch cables with high performance Category 5e or Category 6 cables 2 Reduce the number of connectors used in the link 3 Reconnect some of the connectors in the...

Page 33: ...on each 10 100 Mbps port However taking into account some power loss over the cable run the amount of power that can be delivered to a terminal device is 12 95 W If a device draws more than 15 4 W fro...

Page 34: ...will light to indicate that the connection is valid Network Wiring Connections Today the punch down block is an integral part of many newer equipment racks It is actually part of the patch panel Inst...

Page 35: ...er optic port requires 50 125 or 62 5 125 micron multimode fiber optic cabling with an LC connector at both ends XXXXXXX 1 Remove and keep any protective port covers When not connected to a fiber cabl...

Page 36: ...ons should also work for 1000BASE T providing that all four wire pairs are connected However it is recommended that for all critical connections or any new cable installations Category 5e enhanced Cat...

Page 37: ...devices to which it is connected Note the length of each cable and the maximum cable length supported by the switch ports For ease of understanding use a location based key when assigning prefixes to...

Page 38: ...Making Network Connections 32 NXA ENET24 Hardware Installation Guide...

Page 39: ...which you are connecting to the switch has not been disabled If it has not been disabled then check the network cabling that runs between your remote location and the switch Troubleshooting Chart Sym...

Page 40: ...g items Check that all stacking cables are properly connected Check if any stacking cables appear damaged Check that only one Master Select button is pressed in Check that all switches in the stack ar...

Page 41: ...Troubleshooting 35 NXA ENET24 Hardware Installation Guide...

Page 42: ...egistered trademarks of AMX AMX reserves the right to alter specifications without notice at any time It s Your World Take Control 3000 RESEARCH DRIVE RICHARDSON TX 75082 USA 800 222 0193 469 624 8000...

Reviews: