![AMX DGX-AIE Hardware Reference Manual Download Page 263](http://html1.mh-extra.com/html/amx/dgx-aie/dgx-aie_hardware-reference-manual_2939028263.webp)
Appendix E - Upgrading/Downgrading the System
263
Enova Digital Media Switchers - Hardware Reference Manual
8.
Push on the CPU removal tab firmly enough for the board to make a good electrical connection (avoid pushing on
the connectors). When the CPU board is fully inserted, its faceplate should sit flush with the back metal.
9.
Set the old faceplate aside and attach new faceplate provided with CPU.
NOTE:
If ASB boards will be used in the upgraded system, install them prior to applying power to the system for the first time
with a 100 Series CPU installed. For more information about ASB boards, see Audio Switching Boards - Rules for System Setup
on the following page.
10.
Connect the enclosure (via the LAN 100/1000 port) to your public LAN.
11.
Re-attach any cables that were removed in Step 2.
12.
Apply power to the enclosure.
13.
Check the CPU’s System Status LED for indications of normal display (FIG. 149):
14.
Wait for the 5002 device to come online (15 - 30 min, depending on enclosure size).
NOTE:
For information about reducing boot time, see the "Important Information for CPU Upgrade from Enova DGX 8/16/32/64 to
100 Series - section on page 261.
15.
If input and/or output boards have been removed from the enclosure, re-insert boards with the system powered and
continue with the enclosure upgrade instructions.
16.
To upgrade the enclosure/boards, follow the directions on page 264.
Optional (recommended) –
Affix the provided sticker to label the product as part of the Enova DGX 100 Series. Enova
DGX Switchers upgraded to the 100 Series are supported by the Hardware Reference Manual – Enova DGX 100 Series
Digital Media Switchers and other documentation marked for the 100 Series.
Audio Switching Boards (ASB and ASB-DAN) - Rules for System Setup
Audio Switching Boards must be installed as pairs. They will not work unless both an input and an output board are
installed in the same enclosure (if the enclosure is an Enova DGX 6400, two input and two output boards are
required).
When adding ASB Boards to an enclosure that does not already have them installed, be sure to use the correct
board set designated for the enclosure size:
FG1061-716 – Audio Switching Board Set for the Enova DGX 800/1600 (contains 2 boards)
FG1061-732 – Audio Switching Board Set for the Enova DGX 3200 (contains 2 boards)
FG1061-764 – Audio Switching Board Set for the Enova DGX 6400 (contains 4 boards)
FG1061-832 – Dante Audio Switching Board Set for the Enova DGX 800/1600/3200 (contains 2 boards)
FG1061-864 – Dante Audio Switching Board Set for the Enova DGX 6400 (contains 4 boards)
Enova DGX 6400 Audio Switching Boards must be installed in specific expansion board slots:
Audio Switching Input Boards (2) in the left and right slots immediately above standard input board slots
Audio Switching Output Boards (2) in the left and right slots immediately below standard output board slots
FIG. 148
Align CPU with board guides
FIG. 149
System Status LED indicator (Enova DGX 800 shown)
LED Indicator
Indicates
Normal Display
Cautionary Display
System Status LED
System status
• Solid amber during boot load (10 sec)
• Solid green during app load (1-4 minutes,
depending on system configuration)
• Flashing green when ready
Blinking red/green: MCPU is in a fault state.
Power cycle may recover; otherwise, contact
technical support.
(Systems with 100 Series CPU and I/O boards that
have incompatible firmware use red/green
blinking LED to indicate that enclosure/boards
still require an upgrade.)
System Status LED