Start Up
Fine Tuning Procedures
1.
Restore power and pressurize system until pump cuts off.
2.
Open one or more fixtures to reduce pressure and initiate a
pump cycle.
3.
Check operation. Make adjustments only when the tank is
empty of water and the system is off.
Adjusting Precharge After Installation
Step 1.
Drain tank of all water. Check precharge pressure in the
Titan Tank.
Step 2.
Release or add air as necessary to set the precharge
pressure 2 psig below the pressure switch pump cut-in setting.
Maintenance
A licensed professional should check the complete system,
including the Titan, yearly and more frequently as the system ages.
Warranty
TC Models: Five (5) Year Limited Warranty
Visit www.amtrol.com for complete warranty details and to
register the serial number of your well tank.
© 2022 Worthington Industries, Inc. Part #: 9004-003 (02/22)
1400 Division Road, West Warwick, RI USA 02893
T: 800.426.8765
www.amtrol.com
Mulitiple Tank Diagram
PRESSURE
SWITCH
PRESSURE
SWITCH
MAIN
PRESSURE
GAUGE
RELIEF
VALVE
DRAIN
TYPICAL HEADER TO TANK PIPING
TO TITAN
TO SYSTEM
UNION
SHUT-OFF VALVE
DRAIN
SUPPLY
SUPPLY
SUBMERSIBLE PUMP
All tanks should be set with the same pressure based on system setup.