background image

Start Up

Fine Tuning Procedures

1.

 Restore power and pressurize system until pump cuts off.

2.

 Open one or more fixtures to reduce pressure and initiate a 

pump cycle.

3.

 Check operation. Make adjustments only when the tank is 

empty of water and the system is off.

  

Adjusting Precharge After Installation

Step 1. 

Drain tank of all water. Check precharge pressure in the 

Titan Tank.

Step 2.

 Release or add air as necessary to set the precharge 

pressure 2 psig below the pressure switch pump cut-in setting.

Maintenance

A licensed professional should check the complete system, 

including the Titan, yearly and more frequently as the system ages.

Warranty

TC Models: Five (5) Year Limited Warranty

Visit www.amtrol.com for complete warranty details and to 

register the serial number of your well tank.

© 2022 Worthington Industries, Inc. Part #: 9004-003 (02/22)

1400 Division Road, West Warwick, RI  USA 02893

T: 800.426.8765  

www.amtrol.com

Mulitiple Tank Diagram

PRESSURE

SWITCH

PRESSURE

SWITCH

MAIN

PRESSURE

GAUGE

RELIEF

VALVE

DRAIN

TYPICAL HEADER TO TANK PIPING

TO TITAN

TO SYSTEM

UNION

SHUT-OFF VALVE

DRAIN

SUPPLY

SUPPLY

SUBMERSIBLE PUMP

All tanks should be set with the same pressure based on system setup.

Reviews: