Installation
THIS PRODUCT MUST BE INSTALLED
BY A LICENSED PROFESSIONAL.
1.
Be sure to have a complete bladder kit (bladder kit consists of
blind flange, bladder support pipe and bladder assembly).
2.
Isolate tank from system.
3.
Drain water from bladder.
4.
Remove air valve core to bleed remaining air charge.
5.
Remove drain plug. (Figure 1).
6.
Disconnect system connection.
7.
Unbolt blind flange from tank and pull out bladder kit from
tank. (Figure 2).
8.
Wash down inside walls of tank as necessary.
9.
Mop up remaining water.
10.
Dry out inside of tank (reversed vacuum cleaner or air line
from compressor).
11.
Clean out any remaining dirt.
12.
Examine interior of tank for any rust blisters and remove them.
13.
Fold new bladder around bladder support pipe. (Figure 3).
14.
Insert new bladder kit into bottom of tank.
Use existing bolts
from tank flange.
(Figure 4).
15.
Using water from spray bottle, lubricate bladder to make it
easier to fit through flange opening. (Figure 5).
Figure 1
Figure 2
Figure 3
Figure 4
Figure 5
PLEASE READ THE FOLLOWING INSTRUCTIONS CAREFULLY
IMPORTANT GENERAL SAFETY INFORMATION -
ADDITIONAL SPECIFIC SAFETY ALERTS APPEAR IN THE FOLLOWING INSTRUCTIONS.