Single Post Lift AM-PSPL6
17
MONTHLY INSPECTION
Item
Maintenance Contents
Solution
1
Inspect rubber pads
Replace rubber pads if required
2
Check hydraulic hoses and line for
possible lease or damage
Tighten the fittings and if needed
replace the hose
3
Check if the pivot chain sheave and
chain are in their position.
Add lubrication or adjust again.
4
Check if it is time to add or change
hydraulic oil.
Add or change the oil.
EVERY 6 MONTH INSPECTION
Item
Maintenance Contents
Solution
1
Lubricate rollers and pins
Use gear oil or equivalent
2
Check hydraulic hoses and line for
possible leak or damage
Tighten the fittings and if
needed replace the hose
3
Check if the pivot chain sheave and
chain are in their position.
Add lubrication or adjust again.
4
Check for Cable tensions
Tighten the cable nuts
Summary of Contents for AM-PSPL6
Page 1: ...PLEASE READ THE PRODUCT MANUAL ENTIRELY BEFORE INSTALLING OR OPERATING THE LIFT ...
Page 8: ...Single Post Lift AM PSPL6 8 LIFT DIMENSIOINS ...
Page 15: ...Single Post Lift AM PSPL6 15 Control unit Release handle ...
Page 21: ...Single Post Lift AM PSPL6 21 CIRCUIT DIAGRAM ...
Page 22: ...Single Post Lift AM PSPL6 22 EXPLODED DRAWING ...
Page 24: ...Single Post Lift AM PSPL6 24 MAINTENANCE LOG ...