ELECTRICAL INSTALLATION
All electrical installation and service must be accomplished by a qualified electrician.
Follow all national and local electrical codes and ordinances.
“WARNING”
LOCK POWER IN OFF POSITIION
All internal wiring has been factory installed and tested prior to shipping. Electrical
installation consists of providing adequate machine power only.
Check building service to ensure correct voltage is available and those current
requirements can be met (according to nameplate (serial number), see page 14).
Install receptacle (provided) to properly protect building circuit. Select appropriate
wire size and current protection to accommodate current requirements as shown on
nameplate. Plug in power cable.
Clear all personnel from machine area. Ensure machine is clean and no tools, rags,
or debris have been left on conveyor belt or near cutters or drive mechanism.
Turn building service drop power on. Check voltage at installed receptacle.
Ensure area is clear. Turn key switch on. Jog reverse. Check for proper motor
rotation. If rotation is wrong, unplug power cable. Check that power is off with
voltage meter at panel. Remove any two power wires from the motor starter,
reverse and reconnect.
Clear area, turn on power and recheck rotation.
Electrical installation is complete.
Replace all guards.