
ACTIV-PRO3 HEIGHT ADJUSTABLE BASE
INSTALLATION GUIDE | 6
amqsolutions.com
PHASE 3 | Attaching Cantilevers & Feet
Step 1
Plug cantilevers into the stretcher bar ends, lining
up holes. Add screws M6 (special). Tighten using
#4 allen key (or a long extension angle-tipped allen
key to expedite the process).
2
2
1
Step 2
Attach feet to legs with M10 screws.
NOTE:
Trim caps will be attached in Phase 4.