
ACTIV-PRO3 HEIGHT ADJUSTABLE BASE
INSTALLATION GUIDE | 5
amqsolutions.com
PHASE 2 | Attaching Stretcher Bar
Step 2
Assemble stretcher bars into the frames.
Step 3
Complete connecting the stretcher bars and
stretcher bar ends. Assemble end legs to the
stretcher bar ends using M6 (special) screws.
NOTE:
Trim caps will be attached in Phase 4.
2
3
*For 48” width worksurfaces, do not install stretcher bars.