ACTIV-Pro3
installation guide
Page 1: ...ACTIV Pro3 installation guide ...
Page 2: ...enter leg bracket x 1 end leg x 2 center leg x 1 M10 x 8 M6 special x 8 wood screw x 23 M6 x 12 handset screw x 2 cable clips x 12 8mm 5mm allen keys 4mm screw caps x 8 stretcher bar end x 2 stretcher bar x 4 frame BL x 1 frame BR x 1 frame FL x 1 frame FR x 1 controller cable x 2 power cable handset x 1 power box x 1 ...
Page 3: ...IDE 3 amqsolutions com PHASE 1 Leg Attachment Step 1 Identify center leg Step 2 Assemble center leg to center bracket with M6 screws 2 1 Front Right Back Right Front Left and Back Left are indicated on Center Bracket with the initials FR BR FL and BL ...
Page 4: ...PHASE 2 Attaching Stretcher Bar 1 BL BR FL FR Step 1 Match up frames to center bracket lining up the holes to the degree that you are setting 90 or 120 Screw in with M6 screws 1 Note limit of stretch length and assemble base within that limitation maximum mounting distance ...
Page 5: ...tcher Bar Step 2 Assemble stretcher bars into the frames Step 3 Complete connecting the stretcher bars and stretcher bar ends Assemble end legs to the stretcher bar ends using M6 special screws NOTE Trim caps will be attached in Phase 4 2 3 For 48 width worksurfaces do not install stretcher bars ...
Page 6: ...Cantilevers Feet Step 1 Plug cantilevers into the stretcher bar ends lining up holes Add screws M6 special Tighten using 4 allen key or a long extension angle tipped allen key to expedite the process 2 2 1 Step 2 Attach feet to legs with M10 screws NOTE Trim caps will be attached in Phase 4 ...
Page 7: ...mqsolutions com PHASE 4 Adjusting Stretcher Bars Step 1 Adjust stretcher bar to desired length Step 2 Tighten 4 factory inset screws to hold desired length in place Step 3 Place caps Make sure the screw bracket stays in the center of the stretcher bars 3 2 1 ...
Page 8: ...rface should be center aligned with the cantiliver depth and should have equal amount of overhang on each end Step 2 Attach the handset to desired location using handset screws count x2 Step 3 Plug in electrical according to the diagram at right Attach cable management clips if using Facing Direction Handset Power Connect each plugs according to the drawing Orientate yourself to the table assembly...
Page 9: ...by the number 1 2 3 or 4 Step 2 To Test Programmed Height Use the up down arrows to adjust the table to a height other than the preset height Then push and hold the number you programmed to see if it automatically adjusts to the height programmed in Step 1 You may need to hold for 2 3 seconds to activate the base NOTE If it does not adjust to the programmed height repeat Step 1 followed by Step 2 ...
Page 10: ...Please contact cc amqsolutions com if you are missing any parts have difficulty with assembly or have any product related questions ...