29
C2LINX
Amphenol Network Solutions
All rights reserved. 04.13.20 150717 A0
509.926.6000
— amphenol-ns.com
®
22. Route the fiber to your cable manager
23. Repeat steps 18-24 for each fiber cable.
24. Once complete, use the yellow handle to push the tray back into the chassis and rotate the handle to lock the
tray in place.
6.6 Adding/Replacing Fiber Jumpers to an Installed Patch Module
The shuttle was designed to move patch connectors from the back to the front of the chassis when the cassette
has been partially populated without removing the whole cassette.
1. Locate the front of the tray where you want to add fiber. Using the yellow handle, pull the tray out
(Fig 6-12)
.
If
replacing fiber, detach the fiber to be replaced.
2. Push the tray to close.
3. Go to the rear of the tray and pull to open.
4. Lift the shuttle up and pull it back as shown.
Fig. 6-11: Routing fiber through the links
Fig. 6-12: Installing a fiber on the shuttle
New connection on
the cassette
Summary of Contents for C2LINX Series
Page 1: ...C2LINX Installation Guide ...