![AMP Research POWERSTEP 76141-01A Installation Manual Download Page 5](http://html1.mh-extra.com/html/amp-research/powerstep-76141-01a/powerstep-76141-01a_installation-manual_2934062005.webp)
www.amp-research.com
5/9
IM76141 rev 01.20.20
A M P R E S E A R C H P O W E R S T E P
T M
– F O R D F - 1 5 0
Locate mounting points; first and last set of
holes on the inner sill.
Motor Linkage mounts toward the rear of the
truck, with the exception of the passenger side
on SuperCab trucks. Mount the motor linkage
in front on the passenger side of SuperCab
trucks. On SuperCab trucks tie up extra wire
with supplied wire ties.
Light wires will need to
be pulled out of the harness to allow lights
to be installed in proper position.
IDLER ASSEMBLY
MOTOR ASSEMBLY
T
N
O
R
F
7
10
13
Install J-clips and start bolts with washers
installed.
Mount idler assembly and motor assembly. Note:
Filing of sheet metal edge may be required if the
sheet metal holes are misaligned.
2
8
10
Torque
16 FT-LBS.
(22 N·m)
Repeat linkage
installation on
passenger side
Attach wire harness to
controller (make sure
connector locking tabs fully
engage). Mount controller
with the two 11” tie wraps to
factory conduit.
Remove fuse from wire harness
On Regular Cab models remove E-brake cable
and route factory wire harness above cable
mount.
4
5
1
2
3
5
44