[email protected] • 813.978.3900
–5–
INSTALLATION & MAINTENANCE GUIDE
4
5
AMP
®
HydraPro MR11 Well Light (Lamp Ready)
AWL-5005-B-BZ
Dig Hole
Hole
Soil
3”
3”
3”
PVC Tube
Prepare a hole in the
ground. Make sure there are
approximately 3” spaces
surrounding the PVC tube for
pea gravel or sand.
Wire Connection
Holder
Fixture
Body
Wire Connector
Main Supply Cable
Fixture Supply Cable
Soil
PVC Tube
Pass the fixture supply cable
through the holder and the
PVC tube. Place the holder
onto the PVC tube, then place
the fixture body into the
holder properly.
Strip both leads from the
fixture supply cable and the
main supply cable. Using
two wire connectors (sold
separately), connect the leads
from the fixture supply cable
to the main supply cable.