Installation & Operation Manual
Spin Klin™ Nova
910101-001009 | 01.2021
53
19.
Connect the tubes of the water supply (S), water drainage (D) & command tube (C) to
the booster cylinder.
In-line
On-line
20.
Close drain valve and command filter drain valve.
21.
Initiate a manual flushing procedure in order to test the system.
Summary of Contents for Spin Klin Nova Angle
Page 8: ...8 Installation Operation Manual Spin Klin Nova 910101 001009 01 2021 Product Overview Single ...
Page 9: ...Installation Operation Manual Spin Klin Nova 910101 001009 01 2021 9 Battery ...
Page 35: ...Installation Operation Manual Spin Klin Nova 910101 001009 01 2021 35 Single On line Battery ...
Page 43: ...Installation Operation Manual Spin Klin Nova 910101 001009 01 2021 43 Battery ...
Page 80: ...80 Installation Operation Manual Spin Klin Nova 910101 001009 01 2021 On line ...
Page 85: ...Installation Operation Manual Spin Klin Nova 910101 001009 01 2021 85 On line ...