![amiad Arkal Spin Klin 2 User Manual Download Page 6](http://html.mh-extra.com/html/amiad/arkal-spin-klin-2/arkal-spin-klin-2_user-manual_2932246006.webp)
FILTER TYPE 2" AAF
000616
-
10101
9
/
07.2017
Page
6
of
28
2.7 Civil Engineering:
➢
Make sure that the filter installation is done by the manufacturer qualified technicians.
➢
Make sure that any civil engineering work at the installation site such as construction, lifting, welding,
etc. is done by qualified workers / technicians / contractors and in accordance with the relevant local
standards.
➢
While using lifting equipment, make sure that the filter or the lifted part is chained securely and in
a safe manner.
➢
Do not leave lifted equipment if there is no necessity. Avoid working below lifted equipment.
➢
Wear a safety helmet while using lifting equipment.
➢
Make sure that the flooring is sloped to for drainage and to avoid accumulation of liquids.
2.8 Commissioning:
➢
Read carefully the Commissioning and the First Start-up Operation instructions prior to any attempt to
operate the filter.
➢
In order to achieve maximum performance and smooth operation of the filter it is crucial to perform the
startup and first operation procedures exactly as described in this manual.
➢
Commissioning the filter should be done by an authorized the manufacturer technician, do not attempt
to commission the filter unaccompanied since this may lead to undesired damage and may affect your
warranty
coverage.
2.9 Operation and Control:
➢
Do not operate the filter before reading carefully and being familiar with its operation instructions.
➢
Observe the safety stickers on the filter and never perform any operation contradicting the instructions
given.
➢
Never operate or use the filter for purposes other than its original design and operational envelope.
➢
The system has to be used for non hazardous liquids only!
➢
System's cleaning and maintenance shall be carried out only when explosive atmosphere is not present!
2.10 Maintenance:
➢
Servicing the filter should be done only by technicians authorized by the manufacturer.
➢
System's cleaning and maintenance shall be carried out only when explosive atmosphere is not present!
➢
Disconnect the filter from the power supply and lock the Main Power Switch.
➢
Disconnect the compressed air supply, release the residual pressure and lock the Pneumatics Main Valve.
➢
Disconnect the filter from the water system by closing and securing the manual inlet valve. In cases
where the downstream piping network is pressurized, close and secure the manual outlet valve also.
➢
Release the residual water pressure by opening the pressure release / drainage valve.
➢
Empty the filter by opening the drainage valve.
➢
In hot water systems wait till the filter components cool off to a safe temperature.
➢
Place warning signs around the work area as required by the local standards and procedures.
➢
Inspect
the filter’s safety stickers and replace any damaged or faded sticker.
ATTENTION! - Before opening the filter lock, check that there is no pressure in the filter.