- 28 -
VII. MAINTENANCE SCHEDULE
Monthly:
1.
Re-torque the anchor bolts to 150 Nm;
2.
Lubricate cable with lubricant;
3.
Check all cable connection, bolts and pins to insure proper mounting;
4.
Make a visual inspection of all hydraulic hoses/lines for possible wear or leakage;
5.
Lubricate all Rollers, Safety devices with 90wt. gear oil or equivalent.
Note:
All anchor bolts should take full torque. If any of the bolts does not function
for any reason, DO NOT use the lift until the bolt has been replaced.
Every six months:
1.
Make a visual inspection of all moving parts for possible wear, interference or
damage.
2.
Check and adjust as necessary, equalizer tension to insure level lifting.
3.
Check the vertical of columns.
Summary of Contents for PRO-12A
Page 1: ...FOUR POST LIFT Model PRO 12A...
Page 9: ...7 D Install cross beams See Fig 11 Fig 12 Fig 11 Fig 12 2 Hole towards inside 1 3 3...
Page 23: ...21 P Install spring and safety cover of cross beam See Fig 32 Fig 32 3 3 3 8 40 3 2...
Page 26: ...24 CROSS BEAM CYLINDERS Fig 35 Fig 36 3...
Page 27: ...25 MANUAL POWER UNIT Fig 37 Manual 220V 60Hz 1PH...
Page 36: ...34...