![AMGO PRO-12A Installation And Service Manual Download Page 13](http://html1.mh-extra.com/html/amgo/pro-12a/pro-12a_installation-and-service-manual_2932063013.webp)
- 11 -
I.
Assembly offside platform and
slider block,
check the vertical of columns with
Level bar, adjusting with the shims if not, and then tighten the anchor bolts
(See Fig.
20).
Using the ratchet spanner with
socket to tighten the bolts
Fig. 20
46
18
8
Install the slider block
3-15
3-16
3-14
Note: Torque of Anchors is
150N.m.
Summary of Contents for PRO-12A
Page 1: ...FOUR POST LIFT Model PRO 12A...
Page 9: ...7 D Install cross beams See Fig 11 Fig 12 Fig 11 Fig 12 2 Hole towards inside 1 3 3...
Page 23: ...21 P Install spring and safety cover of cross beam See Fig 32 Fig 32 3 3 3 8 40 3 2...
Page 26: ...24 CROSS BEAM CYLINDERS Fig 35 Fig 36 3...
Page 27: ...25 MANUAL POWER UNIT Fig 37 Manual 220V 60Hz 1PH...
Page 36: ...34...