- 5 -
5. Loose the screws of the upper package stand
take off the offside platform
take out
the parts inside the power side platform
then remove the package stand.
6. Move aside the parts and check the parts according to the shipment parts list
(See Fig.
9)
.
7
. Open the parts box and check the parts according to the parts box list
(
See Fig. 10
)
.
Fig. 10
Fig.9
43