Table 4-1 Recommended AC Input and Branch Fusing
LINE AMPS
DISCONNECT
SWITCH *
COPPER CABLE SIZE AWG * *
BRANCH FUSE SIZE
(AMPERES)
POWER
GROUND
0-2.5
30A
5
No. 14
No. 14
2.6-4.5
30A
7
No. 14
No. 14
4.6-7.5
30A
10
No. 14
No. 14
7.6-12
30A
15
No. 14
No. 14
12.1-16
30A
20
No. 12
No. 12
16.1-18
30A
25
No. 10
No. 10
18.1-22
30A
30
No. 10
No. 10
22.1-24.5
60A
35
No. 8
No. 10
24.6-32.5
60A
40
No. 8
No. 10
32.6-40
60A
50
No. 8
No. 10
40.1-45
60A
60
No. 6
No. 10
45.1-57.5
100A
80
No. 4
No. 8
57.6-78
100A
100
No. 2
No. 8
78.1-102.5
200A
125
No. 2
No. 6
102.6-135
200A
150
No. 1/0
No. 6
The above table (Table 4-1) is based on 75°C (167°F) rated conductors and 40°C (104°F) ambient temperatures.
Refer to National Electrical Code (2008) Tables 310-16 corrected to 40°C (104°F).
* For 115, 208, and 230-volt lines, use 250-volt disconnect switch.
For 440-480, 575-volt lines, use 600-volt disconnect switch.
* * Two conductors and ground conductor required for single phase.
Three conductors and ground conductor required for three phase.
Recommended minimum size of grounding conductors (based on National Electrical Code 2008 – Table 250-95).
Line Connections to Battery Charger
Follow local code requirements if different than
instructions in this manual.
1
. Turn charger OFF.
2.
Be sure charger is connected correctly for available
line voltage as instructed above.
3.
On charger nameplate, note the AC input amperes
corresponding to the line voltage to which charger
is to be connected. Use that ampere value to select
the proper disconnect switch, fuse, and power cable
sizes from Table 4-1.
4.
Route AC power input cable in through knockout
provided in the charger cabinet. Securely fasten
cable wires to a power input terminal inside
charger. Refer to Grounding section of this manual
for proper connection of grounding conductor.
(The lower access panel will have to be removed to
provide access to terminal block.)
5. With disconnect switch (on AC input power line)
in ―OPEN‖ or ―OFF‖ position, connect power
cable coming from charger, to the switch. Install
fuses in switch.
Summary of Contents for ECLIPSE II
Page 2: ......
Page 4: ......
Page 6: ...September 30 2011 193111 095 TABLE OF CONTENTS This page intentionally left blank...
Page 8: ...193111 095 INTRODUCTION 1 2 September 30 2011 This page intentionally left blank...
Page 12: ...3 2 September 30 2011 193111 095 DESCRIPTION OF EQUIPMENT This page intentionally left blank...
Page 20: ...6 4 September 30 2011 193111 095 OPERATION This page intentionally left blank...
Page 32: ...Figure 7 2...
Page 40: ...193111 095 PROGRAMMING YOUR EC2000 CONTROL Figure 8 1 8 8 September 30 2011...
Page 50: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......