Standard Components

Operation

The On-Off Float Control Valve is designed to open fully or close 
drip-tight as commanded by the Float Control Pilot. The Float Pilot 
may be either valve or remote mounted. The valve closes drip tight 
when water level reaches the adjustable high-level setpoint, and 
opens fully when water level is below the adjustable low-level set-
point, allowing a calculated "draw-down" of water level to increase 
tank circulation. 

The On-Off Float Pilot directs upstream pressure into and out of the 
cover chamber of the 3-way Accelerator Pilot. When the cover of 
the Accelerator Pilot is pressurized, the main valve cover chamber 
is vented downstream, causing the valve to open fully. When the 
cover of the Accelerator Pilot is de-pressurized, the main valve cov-
er chamber is connected to upstream pressure, causing the valve 
to close drip tight. Valve opening and closing speeds are separate-
ly adjustable. When water level reaches the adjustable high-level 
setpoint, the Float Pilot de-pressurizes the cover chamber of the 

1

Y/FC

P/L

2

4

5

6

X

X

X

3A

3B

CLOSES VALVE

OPENS VALVE

FLOW

1.  Prior to installation, flush line to remove debris. 

2.  Install valve so the flow arrow matches flow through the line, and gauges to monitor valve inlet and outlet pressures. A Position 

Indicator can be installed to provide visual indication of valve position and operation without disassembly. 

3.  Install isolation valves upstream and downstream of the main valve. 

4.  Provide adequate clearance for valve servicing and maintenance. Refer to valve servicing dimensions on next page. Avoid installing 

valves 6" and larger in the vertical position (main valve stem horizontal). Automatic Control Valves (ACVs) are designed for horizon-
tal in-line installation, with the cover facing up (main valve stem vertical). Slow operation or premature stem and guide wear may 
occur if valve is not installed according to factory recommendations. Consult factory for detailed engineering review prior to order-
ing if valve is to be installed other than horizontally in-line. 

5.  If valve is equipped with a pilot control system, extra precautions should be made during installation to protect the piping circuit 

from damage. Only remove the pilot control system from the valve if necessary. Tubing and fittings should be kept clean and 
replaced exactly as removed. Consult appropriate hydraulic schematic to ensure proper re-assembly. 

6.  Install float control onto tank and connect lines to valve per Watts Model F10-13 Specification Sheet. 

7.  Adjust level stops to the high- and low-level settings.

Start-up of an automatic control valve requires that proper procedures be followed. Time must be allowed for the valve to react to 
adjustments and the system to stabilize. The objective is to bring the valve into service in a controlled manner to protect the system 
from damaging over-pressure.

3-Way Accelerator, closing the valve drip tight. The valve remains 
closed as water level decreases. When water level reaches the 
adjustable low-level setpoint, the Float Pilot pressurizes the cover 
chamber of the 3-Way Accelerator, opening the valve fully. High 
and low levels are separately adjustable by positioning stop collars 
on the float rod(s) at desired opening and closing setpoints. 

If desired, the float on-off action of the valve can be "reversed" by 
modifying the hydraulic connections of the On-Off Float Pilot.

1 – Main Valve (905GD – Single Chamber) 
2 – On-Off Float Control 
3A – High Level Adjustment Stop 
3B – Low Level Adjustment Stop 
4 – Model 22-1 Accelerator Control 
5 – Adjustable Closing Speed 
6 – Adjustable Opening Speed 
X – Isolation Cocks

Installation

972GD-19 (Globe) On-Off Float Control Valve (6" and Larger)

2          IOM-A-ACV-972-19_672-19   2115 

EDP# 1917110 

© 2021 Watts

Summary of Contents for 672GD-19

Page 1: ...oat Control Valve 3 Maintenance Schedule 6 Trouble Shooting Guide 6 Valve Disassembly Instructions 8 ACV Schematic 11 Local building or plumbing codes may require modifica tions to the information pro...

Page 2: ...facing up main valve stem vertical Slow operation or premature stem and guide wear may occur if valve is not installed according to factory recommendations Consult factory for detailed engineering re...

Page 3: ...in 10 10 12 14 14 16 24 26 28 30 34 40 Counterclockwise to OPEN bleed valve STEP 1 To ensure proper operation any trapped air will need to be bled off the valve cover during startup The ACV includes...

Page 4: ...ng Speed Flow Control allows free flow into the cover and restricted flow out of the cover of the main valve If valve opening is too slow turn the adjustment screw OUT counterclockwise See Figure 3B i...

Page 5: ...specification sheets for approximate cover capacity A continuous flow of water from the open port indicates a damaged diaphragm or loose disc diaphragm assembly Disassemble valve and replace diaphragm...

Page 6: ...1 2 turns open from full closed position Can be adjusted in field Main Valve will not close Closed isolation valves in pilot system Check isolation valves ensure open Diaphragm is damaged Conduct diap...

Page 7: ...move cover nuts and washers 3 Remove the cover If cover is not free to be removed loosen it by tapping upward along its outside edge with a dull cold chisel pic tured above a Large valves may require...

Page 8: ...rush or by using a Mineral Dissolving Solution Inspect parts for wear and replace if necessary 7 Inspect valve seat If seat is not damaged removal is not necessary Valve seats 6 and smaller are thread...

Page 9: ...uts in a crossing pattern to ensure even distribution Test the Disc and Diaphragm Assembly for smooth travel by following the Freedom of Movement Test procedure in previous section 11 Test the integri...

Page 10: ...el 10 Diaphragm Washer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 11 Diaphragm Buna N Nitrile 12 Disc Retainer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 13 Seat Disc Buna N Nitrile 14 Spacer Wash...

Page 11: ...IOM A ACV 972 19_672 19 2115 EDP 1917110 2021 Watts 11 NOTES...

Page 12: ...resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances over which the Company has no cont...

Reviews: