20 //
28
Rave Stair Lift Manual | www.Ameriglide.com | 866-378-6648
20419 P/N: 630-00078 Rev E
FOLDING RAIL CONVERSION
VI. FOLDING RAIL CONVERSION
A. WHERE YOU SHOULD WORK
Ensure that you have a sufficient amount of space. This process can be done on a
workbench or on the floor. Choose a work surface that isn’t going to damage the finish,
such as carpet or a large piece of cardboard.
B. TOOLS REQUIRED
q
Wrenches (
1
/
2
"
deep socket,
9
/
16
"
open end and 13mm wrench or socket
q
Allen wrenches (
3
/
16
"
,
1
/
4
"
, and
5
/
16
"
)
q
Pencil
q
Phillips screwdriver, size #2 (the “medium” size)
TOOLS Optional
q
White lithium grease
q
Spray cleaner
q
Paper Towels
C. FOLDING RAIL CONVERSION PROCEDURES
STEP 1:
Remove the gas strut from the
right-hand stair rail’s two ball mounts.
To remove the ball mounts, remove the wire retainer clips that hold
them on. Pull the ball-ends straight-up to remove.
Use a 13mm wrench to remove both ball mounts from the link arm
and fork. Take both ball-ends out and set them aside. Leave the
jam-nuts on them.
Step 1
Step 1
Step 1
These two
Summary of Contents for RAVE
Page 28: ...20419 P N 630 00078 Rev E ...