5 //
12
Hercules II 600 Vertical Platform Lift Owner's Manual | www.Ameriglide.com | 866-378-6648
P/N: 610-00018 RevC 11819
CODE AND SITE REQUIREMENTS
Code Requirements
This platform lift is designed to meet ASME A18.1 section 5 and CSA B44 / ASME A17.5 with
the addition of certain options. Code requirements for vertical platform lifts vary depending
on location. Your installer is responsible for contacting your local code enforcement office to
determine all applicable regulations prior to installing vertical platform lifts.
Site Requirements
The lift requires a 120 VAC 15 AMP grounded circuit. Outdoor installations require a GFI
protected circuit. Lift must be installed on a 4
"
thick, level 3,500 PSI reinforced concrete slab.
The footprint requires 50
"
x 70
"
area (this includes the folding access ramp).
OPERATION
Up or Down Direction Button
The limit switches will stop the lift platform level with the upper landing. At the bottom, the
access ramp unfolds and rests on the ground.
Emergency Stop
Press the Emergency Stop button. This will prevent the lift from running in either direction. To
operate the lift normally, pull the switch back out.
NOTE:
The sensor pan beneath the platform is designed to stop the lift when it hits an object
underneath it. You can verify the operation of the sensor pan by starting the lift at the top
landing. Press up on the sensor pan. While holding the pan in this location, press the down
switch on the platform. The lift should not run. Check all sides and middle of the safety pan.
SAFETY
IMPORTANT: Read all instructions in this Owner’s Manual before operating the lift.
CAUTION: Center weight on lift’s platform. Lock brakes before operating lift when using
with a wheelchair or scooter. Do not use lift if you suspect damage or wear.
Summary of Contents for AMGHERC600-4
Page 12: ...P N 610 00018 RevC 11819 ...