SEQUENCE OF OPERATION FLOW CHART
Description of this flow chart can be found in the “SEQUENCE OF OPERATION” section found on page 27.
Thermostat calls for heat
Switch power on to unit
Blower engages Prover Switch
Ignition Control monitors
flame signal
Loss of flame signal?
YES
YES
NO
NO
Blower power relay is energized to
start blower
Ignion Control provides power to Spark
Igniter and Pilot Gas Valve and monitors
Flame Sensor to determine if Burner is lit
24VAC power to the Ignion
Control and self check
Trial for ignion
Spark Off and Open main Gas Valve
5 minutes retry
delay
Close pilot gas
valve and Spark off
Flame Proved?
Close Main valve
and Pilot valve
30 Seconds Prepurge
Thermostat is sasfied
Blower – off; Blower Prover – opens
Ignion Control – off; Gas Valve – closes
FIGURE 24.