25
-
All the dimensions are shown in inches
- Header tube dia 1.57” x 1.18“
-
Bracket length – 1.96”
-
½
inch BSP bottom opposite end connections
-
Test pressure: 10 Bar
-
Max working temperature: 8 Bar
-
Heat output – in accordance with EN 442
Please Note: Hydronic units only
- Please allow minimum of 3.93” for valves
-
Summer Element use will affect pipe centres
-
www.americantowelrack.com
Weight
(lbs)
Fixing Centres (H)
+/- 0.07”
Fixing Centres (L)
Height (”)
Length (”)
+/- 0.07”
22.70
28.34
15.74
54.01
66.92
15.74
Saber
RXSB-1000500-BL
RXSB-1800570-BL
39.37
70.86
19.68
22.44
Installation:
Step 1:
Select the desired mounting position, make sure the wall
must be securely attached to a stud or masonry.
It is
NOT
recommended that this unit is installed into Drywall Only.
Step 2:
Loosely screw the wall support (Part 2) into the wall
using the wall screw (5) and washer. Use wall plug (1) if you are
Step 3:
Manoeuvre the rail back onto the bracket and tighten
with the grub screw (3).
Cleaning:
-
Do not use any abrasive or chemical cleaners to clean the
use warm water and a damp cloth.
- Do not clean when hot.
1) Wall Plug
2) Wall Support
3) Grub Screw
4) Allen Key
(Not Supplied)
5) Wall Screw
6) Solid Fixing Lug
1
2
3
4
5
6
Summary of Contents for Apollo RXAP-1050500-CH
Page 28: ...28 American Towel Rack...