background image

M 9 6 8 7 1 5   R e v. 1 . 1

Turn off hot and cold water supplies before beginning.

CAUTION

5

TEST INSTALLED FAUCET

4

Turn HANDLES into "off" position.

Turn on water supplies and check all connections for leaks.

Operate both HANDLES to flush water lines thoroughly.

Check SHOWER HEAD and connections for leaks.

Turn handles into OFF position.

1

ROUGHING-IN FITTING

ROUGHING-IN SHOWER AND SPOUT

2

Prepare water supplies per "Roughing-in Dimensions."

Install VALVE at indicated height and depth.  Notice that finished wall has
to be between the MAX WALL and MIN. which is 1-5/8" below.

Slip COUPLING NUT over supply pipe and screw UNION SWIVEL
to pipe.

For Sweat Connection:  Slip COUPLING NUT over 5/8" O.D.
supply tube and solder tube into UNION SWIVEL or female inlet
of valve.

Connect HOT water supply to left VALVE inlet and COLD water
supply to right VALVE inlet.  Tighten both COUPLING NUTS firmly.

Secure VALVE BODY to cross brace of wall structure.

ELBOW

ROUGH-IN

NIPPLE

TUB

FILLER

PIPE

SPOUT

3

FINISHING INSTALLATION

P r o d u c t   n a m e s   l i s t e d   h e r e i n   a r e   t r a d e m a r k s   o f   A m e r i c a n   S t a n d a r d   I n c .

© A m e r i c a n   S t a n d a r d   I n c .   2 0 0 0

SERVICE

To change direction of handle rotation, 
proceed as follows:

Turn valve to OFF position.
Pull out INDEX CAP and remove
HANDLE SCREW.  
Pull off HANDLE BASE and remove
ADAPTER.
Remove SPRING CLIP.
Lift STOP WASHER, turn 90  and replace.
Replace SPRING CLIP.
Reinstall HANDLE. (See step 4).

If spout drips, operate handles several times from OFF to ON
position.  Do not force - handles turn only 90 .

SPRING

CLIP

STOP

WASHER

90

CROSS

BRACE

UNION

SWIVEL

SUPPLY

PIPE

COUPLING

NUT

"HOT"

"COLD"

PLASTER

GUARD

ROUGH-IN

NIPPLE

ELBOW

Install SHOWER ARM, SHOWER ARM FLANGE and TUB SPOUT.

Remove caps from roughing-in nipples.

Remove PLASTER GUARD by turning counter-clockwise and pulling.

If VALVE BODY is roughed in SHALLOW (more than 1-1/2") screw
SLEEVE in ESCUTCHEON facing front of ESCUTCHEON.

If VALVE BODY is roughed in DEEP (less than 1-1/2")
screw SLEEVE in ESCUTCHEON facing back of ESCUTCHEON.

Assemble RUBBER RING to ESCUTCHEON.

Screw ESCUTCHEON and SLEEVE onto VALVE COVER against wall.

D E E P   R O U G H - I N

L E S S   T H A N
1 - 1 / 2 "

S L E E V E

S L E E V E

M O R E   T H A N
1 - 1 / 2 "

E S C U T C H E O N

R U B B E R
R I N G

S H A L L O W   R O U G H - I N

VA LV E
B O D Y

VA LV E
C O V E R

Prepare SHOWER RISER, ELBOW, and roughing-in NIPPLE and
connect to top outlet of VALVE BODY.  Outlet is 1/2" female NPT.

Add cross braces to wall structure and secure piping.

Prepare TUB FILLER PIPE, ELBOW and 1/2" N.P.T. SPOUT NIPPLE.
Final length of SPOUT NIPPLE to be 1-1/2" from finished wall.

Cap roughing-in nipples, open supply lines and check for leaks.

Close both valves, turn off water supplies, and replace PLASTER GUARDS.

Finish wall construction.

MAXW

A

LL

M

IN

1-5

/8"D

EEP

MA

X

W

A

L

L

M

IN

1-5

/8"D

EEP

MAXW

A

LL

M

IN

1-5

/8"D

EEP

STEM

SOCKET

PLASTER GUARD has a STEM SOCKET to operate valves.

Turn PLASTER GUARD over and push STEM SOCKET onto VALVE STEM.
Open hot and cold valves and check for leaks.

Remove PLASTER GUARDS by turning counter clockwise and pulling. (Do not discard).

HOTLINE FOR HELP

For toll-free information and answers to your questions, call:

1 (800) 442-1902

Weekdays 8:00 a.m. to 7:00 p.m. Eastern Time

IN CANADA  1-800-387-0369   (TORONTO 1-905-306-1093)

SHOWER

ARM

SHOWER

HEAD

"MAX

WALL"

IN MEXICO  01-800-839-12-00

Reviews: