background image

Connect HOT water supply to inlet of left SHANK and COLD
water supply to right SHANK using sealant, appropriate
connectors, and COUPLING NUTS.

Connect 1-1/4” O.D. tailpiece on POP-UP DRAIN to

waste outlet.

Thread TEE BODY 

(4)

 to SPOUT SHANK 

(5)

.

Thread HOSE CONNECTOR 

(6, 6A)

 to VALVE CONNECTIONS 

(7, 7A)

.

9

Connect water supply to VALVE BODIES 

(1,1A)

 with 1/2" IPS FLEXIBLE

SUPPLIES 

(2)

 or 3/8" O.D. BULL-NOSE RISERS 

(3)

. Use

adjustable wrench to tighten connections. Do not over tighten.
Be careful not to kink copper supply when bending. Use tubing
cutter to cut to proper length.

MAKE WATER SUPPLY AND WASTE CONNECTIONS

NOTE: FLEXIBLE SUPPLIES OR BULL-NOSE RISERS NOT INCLUDED

AND MUST BE PURCHASED SEPARATELY.

HOT

COLD

FERRULE

COMPRESSION

NUT

COUPLING

NUT

FLEXIBLE

SUPPLIES

1

1A

3/8 O.D.

BULL-NOSE

RISERS

1/2" PIPE THREAD

 

 

3/8 COMPRESSION

CONNECTION

2

3

4

5

7

6

6A

7A

Thread CABLE CONNECTOR 

(1) 

clockwise

onto DRAIN BODY CONNECTION 

(2)

 and

hand tighten. 

Fig.

 

A.

Your new POP-UP DRAIN installation is
now complete. 

Fig.

 

B.

Note: 

Tailpeice on pop-up drain is 1-1/4” O.D.

Fig.

 

B.

Fig.

 

A.

ATTACH CABLE CONNECTOR

7

2

1

Operate LIFT KNOB 

(1)

 to verify that STOPPER 

(2) 

opens and

closes.

Note: 

If STOPPER 

(2)

 does not open and close properly then refer

to the “troubleshooting section” of these instructions.

CHECK OPERATION OF POP-UP

8

Fig.

 

B.

1-1/4” O.D.

U S 6 0 4 0 4   R e v. 1 . 2      

1

2

3

Reviews: