1
FRAMING INSTRUCTIONS
1a.
Locate studs as required. Ensure roughing-in dimensions are proper, plumb, and square (Fig. 1). It is
strongly recommended that an additional opening be provided for access to the drain components.
1b.
Install drain components to the bath following the manufacturer’s instructions. See the roughing-in
drawing for suggested opening size and location dimensions in specification page.
Fig. 1
Each alcove stud
must be plumb
and square.
30" (762 mm)
4" (102 mm)
8" (203 mm)
3-1/4" (83 mm)
8-3/8"
(213 mm)
2" (51 mm)
Drain
8-1/4"
(210 mm)
14-5/8"
(371 mm)
31-1/4"
(794 mm)
20-7/8"
(530 mm)
14"
(356 mm)
14"
(356 mm)
30" (762 mm)
Drain Cutout
16" (406 mm)
2" (51 mm)
Min Drain Clearance
6" (152 mm)
(Typical)
60-1/8" (1527 mm) Min
60-1/4" (1530 mm) Max
Support Clip
Locations (4 total)