FIGURE D
Clip Locations
3
4
BASE INSTALLATION
INSTALLATION OF BASE CLIPS
3a.
Place base into position and check for level in several directions. (Figure C)
NOTE:
If base is not level, shim or level sub floor using optional mortar.
NOTE
:
Rectangle base shown.
4a.
Once base is in place and level in several directions, attach supplied plastic clips evenly around
the perimeter of alcove studs to the base flange and screw clip into stud. (Fig. D)
NOTE:
Reference “Box Contents” by model to determine how many clips are required.
FIGURE C
Level base in two directions.
Level
Level
TUB
FLANGE
STUD
FIGURE D