background image

- 2 -

2

M965717 Rev. 1.5  (2/19)

• Turn off hot and cold water supplies before beginning.
•  Connect FLEXIBLE SUPPLY HOSES

 (1, 2) 

directly to wall  

supplies. Connection on fitting supplies are 3/8

"

  

compression. Connect left supply hose (Red Stripe) to Hot 
wall supply. Connect right supply hose (Blue Stripe) to Cold 
wall supply. Use adjustable wrench to tighten connections. 
Do not over tighten.

*

 Faucet supplies are 21

"

 long from faucet base.

•  

Note: If additional supply length is required, installer 
must purchase additional parts separately.

• 

 Important: If SUPPLY HOSES (1, 2) are too long,  
loop as illustrated to avoid kinking.

MAKE WATER SUPPLY CONNECTIONS

3

CONNECT SPRAY HOSE & INSTALL WEIGHTS

6

7

8

9

(Optional)

1
2

4

5

3

21"

(610 mm) 

4

CHECK CONNECTIONS FOR LEAKS

•   Move HANDLE  into “off” position.
•   Turn on water supplies and check connections for leaks.
•   Operate HANDLE 

(1)

 up and down, left and right to  

flushwater lines thoroughly.

•   Operate HAND SPRAY and check connections for leaks.

CHECK CONNECTIONS

FOR LEAKS

RED

STRIPE

BLUE

STRIPE

1

2

COLD

HOT

•   Push the SPRAY HOSE END 

(2)

 into the HOSE CONNECTOR 

(1)

 slide down LOCKING COLLAR 

(3)

 until it snaps into place  

to  secure connection.

•   With HAND SPRAY 

(4)

 seated in SPOUT 

(5)

, install WEIGHT 

(7)

 

onto HOSE

 (6)

 21 inches from the underside of the sink deck 

and secure with SCREW 

(8)

.

•   Adding SECOND WEIGHT 

(9)

 is optional.

•   With one weight, spray will retract and dock potentially  

requiring slight assistance.

•   With two weights, spray will retract and dock automatically  

once released. 

•   Please  add  the  SECOND WEIGHT 

(9)

 below the initial  

WEIGHT 

(7)

Reviews: