![american flame AF-LMF-RV Installation And Operating Instruction Download Page 2](http://html1.mh-extra.com/html/american-flame/af-lmf-rv/af-lmf-rv_installation-and-operating-instruction_2924469002.webp)
REV. 11-30-18 Page 2
American Flame: AF-LMF Series Valve Kits
DESCRIPTION:
This installation manual covers four valve kits; AF-LMF, AF-LMF-R, AF-LMF-RD, AF-LMF-RV and
AF-LMF-RVS. Installation is the same for all of the kits however the operation is slightly different. All valve kits are fire
tested at the factory to ensure proper operation. See each kit below and their contents.
Table of Contents
Description & Contents
Page 2
Valve Kit Models
Page 3
Installing into a Pre-Existing Log Set
Page 4
Installing with a New Log Set
Page 4
Clearances and Pilot Installation
Page 5
Connecting Remote Control
Page 6
Lighting Instructions
Page 7
Replacement Parts
Page 8
Troubleshooting
Page10
Warranty
Page10
INSTALLER:
Each valve kit is supplied with a (UR3-68) adapter that provides an option
to convert the inlet or outlet gas connection from 3/8" flare fitting to a 1/2" flared fitting.
Simply thread the UR3-68 on to the inlet/outlet gas flared fitting as shown in Fig. 1.
Note
: No pipe joint compound or thread tape is necessary. Ensure fittings are tight and
test for gas leaks.
Top View
(Back of Valve)
Inlet
UR3-68
Fig. 1
Installing UR3-68 to the
inlet or outlet side of gas valve
Fig. 2
Carton contents:
1thru
5
Valve Kit
6
-Flex Connector
7
-Damper Clamp
8
-Pilot Assembly
9
- Flared Fitting
10
- Battery Pack Heat Shield
11 thru 12
- Battery Packs
13-
CON-1001
14
- 5001
15
- RCAF-1035
16
-RCAF-1020-1
17 thur 19
-Batteries
20
- Adapter fitting
ON
OFF
REMOTE
OFF
LEARN
ON
OFF
OFF
ON
1 2 3
7
5
6
9
8
12
13
16
15
(Attached to Valve)
4
10
11
14
ON/OFF
HML
ON/HI
OFF
LO
AA Batteries
AA Batteries
AA Batteries
AA Batteries
AAA Ba
ttery
AAA Ba
ttery
AAA Ba
ttery
AAA Ba
ttery
12-Volt
17
18
19
20