48
American Dryer Corp.
113068 - 10
SECTION V
PRE START-UP
A. PREPARATION FOR OPERATION
1. The supply voltage must match the dryer voltage as stated on the aluminum dryer data label, which is
located in the right hand side of the main electrical enclosure.
2. Open
ALL
steam supply lines and condensate return line shutoff valves.
3. A compressed air supply of 80 psi (5.51 bar)
must be
connected into the dryer’s fitting located at the rear
corner of the lower heat console section.
4. The dryer exhaust duct
must be
vented to the outdoors.
5. The dryer
must be
lagged to the floor and leveled for proper operation.
6. A fresh air supply from the outdoors of 13,000 cfm (368 cmm)
must be
available to the dryer.
7.
ALL
service doors
must be
closed and
ALL
access panels and tilt guards
must be
installed on the dryer.