
45
B. ADJUSTMENTS
7 DAYS AFTER INSTALLATION and EVERY 6 MONTHS THEREAFTER
Inspect bolts, nuts, screws, (bearing set screws), non-permanent gas connections (unions, shut-off valves,
orifices, and grounding connections). Motor and drive belts
should be
examined. Cracked or seriously
frayed belts
should be
replaced. Tighten loose V-belts when necessary. Complete operational check of
controls and valves. Complete operational check of
ALL
safety devices (door switches, lint drawer
switch, sail switch, burner and hi-limit thermostats).
Summary of Contents for Gas/Electric/Steam AD-75HS
Page 21: ...17 ...
Page 76: ...ADC113039 1 09 01 98 253 ...