background image

AI

 SERIES STEAM BOILER WITH T100  CONTROL

INSTALLATION INSTRUCTIONS

4211-195  05-22-12

Page 13

BOILER CIRCUIT BOARD SET-UP

STARTING THE BOILER FOR THE FIRST TIME (continued)

NOTE:

 When the boiler is started with an empty tank, the room steam valves will open to release the air pressure created during water fi ll. Once the tank 

has fi lled, the valves will operate normally, opening only when steam needs to be released to a room to increase its temperature. Also, whenever a steam 
valve opens to release steam to a room, the boiler heating is disabled for a few seconds. This is designed to increase the elements’ working life.

Set the BOILER OPERATION switch to the right (red showing) or set the optional run clock to a “RUN” position. The BOILER ON light, both room 
STEAM VALVE OPEN lights and the WATER VALVE OPEN light should turn on, one heat contactor will close and the boiler will start 

fi

 lling with water. 

The water will become visible in the water gage a few seconds later. In a short time, the feedwater valve and its light will turn off, the steam valve lights 
will turn off, the BOILER HEATING light will turn on and second heating element contactor will close. The boiler will continue heating until it reaches its 
operating pressure of approximately 4 to 6 psi, then the BOILER HEATING light and one contactor will turn off. 

During normal operation, the water level 

should always be visible in the lower half of the gage glass. 

Check for steam and water leaks. Repair any leaks before continuing.

VERIFY T100 INSTALLATION

After all connections have been made, and the boiler operation veri

fi

 ed (per previous section), make sure the interface box is turned on (PWR light on) 

and power is turned on to the room light (if installed) and the boiler is set to RUN.

• On the boiler: the room steam valve should be closed and the ROOM STATUS lights should be off.
• At the Control: touch the bottom of the T100 screen to light the display. With the       icon lit brightly on the display, press the OK switch. A small 
 should light below the T100 display, the interface board’s two lights should be lit (left light shows power is on, right light indicates room should be
 heating), the room steam valve should open and the boiler’s ROOM STATUS lights should light steadily.
• (Optional) Room Light 

(if installed)

: With the T100 display lit, press the T100’s         switch. There should be a small         icon lit below the display

 and the room light should turn on.

If there are any blinking lights or other failures, recheck all connections. Contact Technical Support for assistance.

OPERATING INSTRUCTIONS

 

The AI boiler steam generation is based on two operating systems. The 

fi

 rst is the boiler itself, maintaining water levels and boiling the water to create 

steam for use in a steam bath. The second is the steam room control circuit, maintaining a comfortable steam bath by releasing steam from the boiler 
only when needed to raise the temperature in the steam room. The boiler’s control circuit board is used for both systems so the boiler must be running 
before starting a steam bath. And the boiler may run continuously without affecting the steam room temperature. In this way the boiler can be left running 
so it is ready to produce steam immediately when the T100 is used to start a steam bath.

Switch Location

 Jumpers, JP101 & JP201

Place jumper on middle and top pin for use with T100

JP101

JP201

TP1

TP2

JP1

JP3

J1

Drain Timing

 Select, JP3

Bath Time

 Select, JP1

Place jumper on one pin
for 12, 18 & 24kW boilers

Place jumper on both pins
for 30, 36, 42 & 48kW boilers

Place jumper on one pins
when using the T100 control

TP1, TP2 & J1: 

used for Service only.

Do Not Jumper!

From T100

Interface Box

Temp Sensor

Bypass

Summary of Contents for AI12

Page 1: ...4211 195 05 22 12 INSTALLATION INSTRUCTIONS FOR THE AI SERIES STEAM BOILER WITH T100 B TOUCH CONTROL MODELS AI12 AI18 AI24 and MODELS AI30 AI36 AI42 AI48 ...

Page 2: ...TROLS 11 12 TEMPERATURE SENSOR 11 12 STARTING THE BOILER 12 13 OPERATING INSTRUCTIONS 13 15 BOILER START 14 STEAM ROOM OPERATION 14 LIGHTS AND SWITCHES 14 15 ROUTINE MAINTENANCE 15 16 WATER LEVEL CONTROL 15 BLOWDOWN AUTODRAIN 15 16 WIRING DIAGRAM AI12 AI24 208 240 480V 60Hz 17 WIRING DIAGRAM AI12 AI24 240 415V 50Hz 18 WIRING DIAGRAM AI30 AI48 208 240 480V 60Hz 19 WIRING DIAGRAM AI30 AI48 415V 50Hz...

Page 3: ...y pregnant women should consult a physician regarding correct exposure e Obese persons and persons with a history of heart disease low or high blood pressure circulatory system problems or diabetes should consult a physician before using a steambath f Persons using medication should consult a physician before using a steambath since some medication may induce drowsiness while other medications may...

Page 4: ... enclosures are properly sealed to avoid water damage from escaping steam It is recommended that 100 silicone caulk be used to seal all pipes and fittings Steam must be prevented from escaping into the wall cavity Avoid traps and valleys in the steam line where water could collect and cause a steam blockage The hot steam line must be insulated against acciden tal user contact Centering the steam p...

Page 5: ...ntrols for these boilers including the T100 s interface box will operate on 120VAC 60Hz Boilers designed typical international voltages of 220 380V 230 400V or 240 415V operate at 240V N for single phase mains and 415V for three phase mains These boilers may be used safely at the common lower voltages All controls for these boilers including the T100 s interface box will operate on 230V N 50Hz The...

Page 6: ...ng installation using a factory supplied cable An access hole and knockouts trade size are provided for room control wiring The T100 may be mounted inside or outside the steam room and its temperature sensor must be mounted inside the steam room Temperature sensors require factory supplied 25 foot 4 6 m long cables for connection to the T100 s adapter box and a 25 foot 4 6 m long shielded cable is...

Page 7: ...000 208 3 84 1250 35 91 17 1 2 x 27 x 24 444 5 x 685 8 x 609 6 30 240 240 73 30 415 415 43 30 480 480 36 AI36 36 208 36 000 208 3 101 1500 43 109 36 240 240 88 415 51 36 480 480 43 AI42 42 208 42 000 208 3 118 1750 50 127 42 240 240 102 415 59 42 480 480 51 AI48 48 240 48 000 240 3 117 2000 57 145 415 68 48 480 480 58 Notes All models use 120VAC 60 Hz or 240V 50 Hz control circuits 208V 240V and 4...

Page 8: ...n 444mm 18in 460mm Minimum Access 21in 533mm Minimum Access with optional LWCO installed 41in 1 04M without LWCO 61in 1 55M with LWCO 1in 25mm Minimum Clearance without LWCO ELECTRICAL ACCESS LWCO ACCESS 2 1 4in 57mm 5 1 2in 140mm 20in 508mm 25in 635mm 23 1 2in 597mm 6in 150mm Minimum Service Access Electric Power Low Voltage Control Wiring Run Timer optional Drain Timer optional 14 3 4in 375mm 22...

Page 9: ...ure may be between 20 and 100 psi 1 4 to 7 bar Feedwater pressure should be limited to approximately 20 psi 1 4 bar for best performance A water hammer prevention device is factory installed on all steam boiler boilers Excessive water hammer can damage a water valve preventing it from shutting off the water supply to the boiler Special water treatment may be required in your area see AUTODRAIN sec...

Page 10: ...crew underneath the steam head to secure it in place with the Allen wrench provided The steam head should be level with its fragrance reservoir at the top IMPORTANT Check all of the standard fixtures in the steam room All fixture penetrations and steam head insulators must be sealed with 100 silicone caulk to avoid moisture dam age within walls When the steam line is in an area where the temperatu...

Page 11: ...er adapter provided which connects to a nearby 120VAC or 230V outlet Select a location which is convenient to the boiler power control and temperature sensor then mount the box on the wall This loca tion should be dry and keep the box safe from damage Remove the box s cover before mounting by gently pulling out on the sides of the box cover until it slides off Locate the two mounting holes inside ...

Page 12: ...1 at the boiler 2 to 2 and 3 to 3 Use a cable strain relief provided to secure the cable to the interface box 5 INSTALL BYPASS The T100 connects to its own temperature sensor through the interface so the normal boiler tempera ture sensor is not connected Instead a sensor bypass supplied must be plugged into the TEMP SENS jack on the boiler s circuit board as shown at right Orient the bypass plug t...

Page 13: ...he boiler is set to RUN On the boiler the room steam valve should be closed and the ROOM STATUS lights should be off At the Control touch the bottom of the T100 screen to light the display With the icon lit brightly on the display press the OK switch A small should light below the T100 display the interface board s two lights should be lit left light shows power is on right light indicates room sh...

Page 14: ...not build up any pressure during this period When the boiler is started with an empty tank the steam outlet valve s will open to release air pressure created by adding water If not released this air pressure could be sensed by the pressure switch preventing heating When the water reaches the safe heating level the heat will turn on and if the steam bath is not turned on the steam valve s will clos...

Page 15: ...urn off and the heat contactor will open This is the low water cut off level Set the BOILER OPERATION switch to off close the drain and reset all switches to their NORMAL position Reset the thermostat to its original position The boiler is now ready for normal oper ation again BOILER BLOWDOWN AUTODRAIN The boiler is supplied with a manual drain valve and may be equipped with an optional electronic...

Page 16: ...The drain cycle will not operate again until power has been reset To manually drain the generator with an electronic Autodrain installed set the ELECTRONIC DRAIN switch to the MANUAL OPEN position When an electronic drain is installed make sure that the manual drain ball valve is always left in the open position Do not touch the safety valve when the boiler is hot the valve will be dangerously hot...

Page 17: ...CUIT FUSE 3 AMP NON TIME DELAY BOILER OPERATION MANUAL RUN CLOCK RUN STEAM VALVE OPEN LIGHT MANUAL OPEN AUTODRAIN CLOCK OPTION M 3241 02x POWER LEVEL CONTROL PRINTED CIRCUIT BOARD H M L DRAIN RELAY DRAIN VALVE OPEN LIGHT ROOM STATUS LEDS DRN AUTODRAIN SOLENOID OPTION OFF ROOM2 LOCKOUT NORMAL STOP FILL ROOM1 LOCKOUT ROOM 2 RELAY ROOM 1 RELAY HEAT HEAT RELAY FEEDWATER RELAY R OFF STM STM STEAM VALVE...

Page 18: ...T FUSE 3 AMP NON TIME DELAY BOILER OPERATION MANUAL RUN CLOCK RUN STEAM VALVE OPEN LIGHT MANUAL OPEN AUTODRAIN CLOCK OPTION M 3241 04x POWER LEVEL CONTROL PRINTED CIRCUIT BOARD H M L DRAIN RELAY DRAIN VALVE OPEN LIGHT ROOM STATUS LEDS DRN AUTODRAIN SOLENOID OPTION OFF ROOM2 LOCKOUT NORMAL STOP FILL ROOM1 LOCKOUT ROOM 2 RELAY ROOM 1 RELAY HEAT HEAT RELAY FEEDWATER RELAY R OFF STM STM STEAM VALVE OP...

Page 19: ...WATER OFF NEUTRAL CONTROL CIRCUIT FUSE 3 AMP NON TIME DELAY BOILER OPERATION MANUAL RUN CLOCK RUN STEAM VALVE OPEN LIGHT MANUAL OPEN AUTODRAIN CLOCK OPTION M 3241 02x POWER LEVEL CONTROL PRINTED CIRCUIT BOARD H M L DRAIN RELAY DRAIN VALVE OPEN LIGHT ROOM STATUS LEDS DRN AUTODRAIN SOLENOID OPTION OFF ROOM2 LOCKOUT NORMAL STOP FILL ROOM1 LOCKOUT ROOM 2 RELAY ROOM 1 RELAY HEAT HEAT RELAY FEEDWATER RE...

Page 20: ...ILER OPERATION MANUAL RUN CLOCK RUN STEAM VALVE OPEN LIGHT MANUAL OPEN AUTODRAIN CLOCK OPTION M 3241 04x POWER LEVEL CONTROL PRINTED CIRCUIT BOARD H M L DRAIN RELAY DRAIN VALVE OPEN LIGHT ROOM STATUS LEDS DRN AUTODRAIN SOLENOID OPTION OFF ROOM2 LOCKOUT NORMAL STOP FILL ROOM1 LOCKOUT ROOM 2 RELAY ROOM 1 RELAY HEAT HEAT RELAY FEEDWATER RELAY R OFF STM STM STEAM VALVE OPEN LIGHT NORMAL CLOSE VALVE WA...

Page 21: ...e boiler should be ON or the drain should be open and away from the center for OFF or drain closed periods When the clock s pointer is in an area with orange showing its switch will close and turn the boiler ON or open the Autodrain for blowdown NOTE The clocks operate on 120VAC supplied by the boiler s control circuit If this circuit loses power the clocks must be reset to the correct time CONNEC...

Page 22: ...4211 195 05 22 12 Page 22 AI SERIES STEAM BOILER WITH T100 CONTROL INSTALLATION INSTRUCTIONS This page intentionally left blank ...

Page 23: ...em with the primary switch Check the primary switch operation by creating pressure in the boiler Also verify that the pressure gauge shows a smooth and steady pressure increase If the primary switch does not open at the correct pressure or the gauge shows rapid pressure increases release all pressure and remove line voltage from the boiler and clean or repair the pressure control assembly as neede...

Page 24: ...4211 195 05 22 12 Page 24 AI SERIES STEAM BOILER WITH T100 CONTROL INSTALLATION INSTRUCTIONS This page intentionally left blank ...

Page 25: ...TIONS 4211 195 05 22 12 Page 25 Always confirm pattern as printed is to scale before using as a template Some printers will change pattern size during printing APPENDIX 2 T100 ROUGH IN 2 5 8 2 5 8 5 5 3 4 Step 1 Drill four 3 4 holes level and plumb as shown below ...

Page 26: ...ote dashed line shows outside edge of T100 control for reference Always confirm pattern as printed is to scale before using as a template Some printers will change pattern size during printing APPENDIX 2 T100 ROUGH IN continued Step 2 Cut straight edges from hole to hole as shown CUT CUT CUT CUT ...

Reviews: